JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
City Development Plan for Agra City in the state of Uttar Pradesh under <strong>JNNURM</strong><br />
Name of the Sector Solid Waste Management<br />
Project Code SWM/1<br />
Project Description Purchase of SW transport equipment & tools<br />
(Containerized tricycles, Containerized Handicrafts,<br />
Seamless Handicrafts, Dumper placer vehicles,<br />
container lifting device skip lifters, Hotel waste<br />
collection vans, Biomedical waste collection vans,<br />
Large Hauling Vehicle, Large hauling container, Bull<br />
dozer, Skid steer Robot, Chain mounted Nala<br />
Cleaning machine large, Nala cleaning machine<br />
mounted on LCV/HCV chasis, sewerage jetting cum<br />
section machine, Tools and equipment for desilting<br />
excavator loader and Back hole attachment.<br />
Conversion of existing 15 trucks into DP).<br />
Implementing Agency Agra Nagar Nigam<br />
Cost of the project Rs.35.03 crores<br />
Project Code SWM/2<br />
Project Description Development of Storage Points (Litter bins, Dumper<br />
placer green & black colour containers<br />
3.0/3.5/4.5/7cmt,Cmt, dumper placer container of<br />
yellow colour for domestic hazardous waste, black<br />
colour skips for construction waste 5 cmt,<br />
Asphalt/concrete flooring under the bins)<br />
Implementing Agency Agra Nagar Nigam<br />
Cost of the project Rs.13.99 crores<br />
Project Code SWM/3<br />
Project Description Compost plants (compost plants of 600 M.T./day or<br />
3 power plants of 200 MT total capacity<br />
Implementing Agency Agra Nagar Nigam<br />
Cost of the project Rs.27.98 crores<br />
Project Code SWM/4<br />
Project Description Landfill site development (Landfill site evelopment (1<br />
of 280 MT/day or 3 of 80 MT day)<br />
Implementing Agency Agra Nagar Nigam<br />
Cost of the project Rs.9.45 crores<br />
Project Code SWM/5<br />
Project Description Capacity Building (Generating public awareness<br />
(*supervision control, MIS)<br />
Implementing Agency Agra Nagar Nigam<br />
Cost of the project Rs.1.05 crores<br />
Total Cost of the Project Rs.87.51 Crores<br />
Financing Strategy Projects costing to the extent of ANN prescribed<br />
contribution i.e. 30% will be implemented without<br />
using Central / State Support on private sector<br />
participation basis which shall require about 5% for<br />
viability gap funding only (Project: SWM3)<br />
154<br />
MDP Consultants in association with Allianz Securities Ltd.