02.08.2013 Views

JNNURM - GANGAPEDIA

JNNURM - GANGAPEDIA

JNNURM - GANGAPEDIA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sector<br />

Storm Water<br />

Drainage<br />

Sector<br />

Solid Waste<br />

Management<br />

City Development Plan for Agra City in the state of Uttar Pradesh under <strong>JNNURM</strong><br />

Table 15.5: Analysis -STORM WATER DRAINAGE<br />

Present Shortfall /<br />

Problems 2006<br />

• About 55 years old<br />

drainage system<br />

• 25 major drains<br />

discharge in R. Yamuna<br />

• Encroachments have<br />

come up over drains<br />

• More than 20 water<br />

logging areas<br />

• Tertiary drains missing<br />

in majority area<br />

• Malfunctioning of<br />

drainage plan<br />

• Garbage dumping<br />

places Increase in<br />

paved area due to new<br />

development has<br />

increased the run off<br />

Problems / Requirement 2021<br />

Future Total<br />

• Additional<br />

requirement of<br />

drains<br />

133<br />

MDP Consultants in association with Allianz Securities Ltd.<br />

• Requirement<br />

of internal<br />

drains<br />

• Maintenance<br />

& cleaning of<br />

drains<br />

• Improvement<br />

of water<br />

logging areas<br />

Table 15.6: Analysis - SOLID WASTE MANAGEMENT<br />

Present Shortfall /<br />

Problems 2006<br />

• About 628 MT/day of<br />

waste is generated<br />

• Segregation &<br />

storage at source does<br />

not exist<br />

• About 70 per cent of<br />

the dumper placer<br />

containers are<br />

damaged<br />

• Waste (petha waste)<br />

is thrown in nallah<br />

and open spaces<br />

leading to<br />

environment<br />

pollution<br />

• 73 transport vehicles<br />

with 60% efficiency<br />

• About 40 % of 561<br />

waste storage depots<br />

are open storage<br />

points<br />

• Dumping site is<br />

exhausted<br />

Problems / Requirement 2021<br />

Future Total<br />

• 1,116.35 MT<br />

waste will be<br />

generated<br />

• More number<br />

of closed<br />

containers<br />

• More transport<br />

fleet required<br />

• New Dumping<br />

sites<br />

• The problem<br />

of SWM will<br />

become<br />

enormous<br />

and needs<br />

scientific<br />

management<br />

Projects<br />

Proposed<br />

Storm Water<br />

Drainage<br />

Network<br />

Purchase of<br />

Modern<br />

Equipment for<br />

De-silting<br />

Projects<br />

Proposed<br />

Solid Waste<br />

Management<br />

Plan

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!