JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sector<br />
Storm Water<br />
Drainage<br />
Sector<br />
Solid Waste<br />
Management<br />
City Development Plan for Agra City in the state of Uttar Pradesh under <strong>JNNURM</strong><br />
Table 15.5: Analysis -STORM WATER DRAINAGE<br />
Present Shortfall /<br />
Problems 2006<br />
• About 55 years old<br />
drainage system<br />
• 25 major drains<br />
discharge in R. Yamuna<br />
• Encroachments have<br />
come up over drains<br />
• More than 20 water<br />
logging areas<br />
• Tertiary drains missing<br />
in majority area<br />
• Malfunctioning of<br />
drainage plan<br />
• Garbage dumping<br />
places Increase in<br />
paved area due to new<br />
development has<br />
increased the run off<br />
Problems / Requirement 2021<br />
Future Total<br />
• Additional<br />
requirement of<br />
drains<br />
133<br />
MDP Consultants in association with Allianz Securities Ltd.<br />
• Requirement<br />
of internal<br />
drains<br />
• Maintenance<br />
& cleaning of<br />
drains<br />
• Improvement<br />
of water<br />
logging areas<br />
Table 15.6: Analysis - SOLID WASTE MANAGEMENT<br />
Present Shortfall /<br />
Problems 2006<br />
• About 628 MT/day of<br />
waste is generated<br />
• Segregation &<br />
storage at source does<br />
not exist<br />
• About 70 per cent of<br />
the dumper placer<br />
containers are<br />
damaged<br />
• Waste (petha waste)<br />
is thrown in nallah<br />
and open spaces<br />
leading to<br />
environment<br />
pollution<br />
• 73 transport vehicles<br />
with 60% efficiency<br />
• About 40 % of 561<br />
waste storage depots<br />
are open storage<br />
points<br />
• Dumping site is<br />
exhausted<br />
Problems / Requirement 2021<br />
Future Total<br />
• 1,116.35 MT<br />
waste will be<br />
generated<br />
• More number<br />
of closed<br />
containers<br />
• More transport<br />
fleet required<br />
• New Dumping<br />
sites<br />
• The problem<br />
of SWM will<br />
become<br />
enormous<br />
and needs<br />
scientific<br />
management<br />
Projects<br />
Proposed<br />
Storm Water<br />
Drainage<br />
Network<br />
Purchase of<br />
Modern<br />
Equipment for<br />
De-silting<br />
Projects<br />
Proposed<br />
Solid Waste<br />
Management<br />
Plan