JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
City Development Plan for Agra City in the state of Uttar Pradesh under <strong>JNNURM</strong><br />
S. No. Projects Proposed<br />
a)<br />
b)<br />
c)<br />
8<br />
9<br />
10<br />
Widening and strengthening of main roads in urban areas 569.99<br />
Mahatma Gandhi Road , Yamuna Kinara Road, two lane Raod along<br />
Yamuna River bank, (water works-1) outer side, Old Mathura Road,<br />
Bodla-Sikandra Road, Madia Katara Road, M.G.Raod, Loha Mandi<br />
Road, M. G. Road to Canal<br />
by-pass Bichuri Road, Subhash Park-Koyji Mina Bazar Road, Barah<br />
Khamba Road to Airport (Arjun Nagar)<br />
Bhagwan Takies-Dayal Bagh Raod, VIP Road, Deori Road, Mall Road<br />
to Proposed Ring Road, Shamshabad Road, Aligarh Road- Ring<br />
Road, Gwalior Road,Widening of Service Road of NH2, Aligarh Road<br />
to Proposed RIng Road etc.<br />
From J.P. Hotel to Proposed Ring Road (100 M.) Fatehabad Road,<br />
Prathavi Nath Phatak to 17.5 KM Road to Fatehpur Sikari NH-11.<br />
Gwalior Road to Canal by-pass, widening of service road of NH2<br />
Construction of remaining master plan Roads under Master Plan<br />
2021 including Road from Fatehabad Road to Gwalior Road<br />
excluding urban Area ( 45m and 30 m wide road), NH-2 to<br />
Fatehapur Sikari excluding urban Area. (60,45, 30 m wide<br />
Road).Aligarh Road to Jalesher Road excluding urban Area. 45,30<br />
and 24 m wide road<br />
Proposed constrution of 100 M wide Ring Road Under Master Plan<br />
2021. including Gwalior Road (NH-3) from NH-3 to NH-2 Connecting<br />
Fatehabad Road, Shamshabad Road and Deori Road, Strengthening<br />
& Widening of Canal Patri Road from Gwalior Road to NH-2,<br />
construction of 100m road from NH-2 to NH-2 connecting Aligarh<br />
Road & Jalesher Road.<br />
Construction of Rail Over Bridge/Rail Under Bridge at different<br />
Railway X-ing including construction of ROB on old Sikandra-Bodla<br />
Road, old Mathura Road Guru Ka Tal, Atorni, Elevated Road/R.O.B.<br />
from Idgha Bus Stand to C.O.D. at Shahganj X-ing. Widening of<br />
R.O.B. at Madiya Katra, Hariparwat, Rawali Temle, Widening of<br />
Culvert between Collectrate & Dhakran (M.G. Road), Construction of<br />
Elevated Road at Alignment of M.G. Road., Construction of<br />
subways, Construction of Yamuna Bridge on Priya-Ghat Road.etc.<br />
141<br />
MDP Consultants in association with Allianz Securities Ltd.<br />
Project Cost<br />
(in crores) Department<br />
A.D.A.<br />
P.W.D.<br />
N.H.A. I., P.W.D.<br />
823.77 ADA<br />
1409.61 NHAI<br />
415.13 UP Bridge<br />
Corporation<br />
11<br />
Development of internal roads 390.69 ANN<br />
12<br />
Development of parking areas in the city 20.99 ANN<br />
13 Development of approach road to Taj & other heritage sites 34.98 ADA<br />
Improvement in street lighting 10.76 ANN<br />
14<br />
15<br />
Intersection Signaling 2.63 RTO<br />
16<br />
Improvement of road geometrics & street furniture 18.41 ANN<br />
17<br />
Footpath improvement 12.47 ANN<br />
18<br />
Foot over Bridges/ Pedestrian underpasses 24.32 ANN<br />
19 Construction of Fly over (Water Works chauraha, Khangari<br />
chauraha, Rui ki Mandi)<br />
20.37 ADA/ANN<br />
Total 4950.35