City Development Plan for Agra City in the state of Uttar Pradesh under <strong>JNNURM</strong><br />

Table 15.13: Projects Cost estimate Water Supply<br />

S. No. Projects Proposed<br />

Project Cost<br />

(in crores) Department<br />

1 Reorganization of existing water works (Rehabilitation of<br />

Water Works –I)<br />

11.3 U.P. Jal Nigam<br />

15.2.4 Sewerage<br />

2 Distribution network: Replacement of damaged rising main,<br />

Replacement of damaged distribution mains<br />

3 Storage Improvement/ enhancement: Repairing of existing<br />

CWR & OHT’s<br />

4 Reduction of UFW: Provision for Unaccounted for Water<br />

Woks<br />

5 Construction/enhancing of<br />

a) New sub zonal pumping station for Nai ki mandi sub zone at<br />

Subhash Park.<br />

b) Enhancing capacity of power sub station at Water Works-I<br />

c) New zonal pumping station at Ghatwasan zone-II<br />

d) New treatment plant at Water Works-II<br />

e) Sludge Treatment plant at Water Works-I & II<br />

138<br />

MDP Consultants in association with Allianz Securities Ltd.<br />

13.45 U.P. Jal Nigam<br />

2.15 U.P. Jal Nigam<br />

2.69 U.P. Jal Nigam<br />

134.02 U.P. Jal Nigam<br />

6 Water Works storage Capacity enhancement (Building<br />

Capacity at Water Works-I, Water Works-II and zonal<br />

pumping station)<br />

4.31 U.P. Jal Nigam<br />

7 Ganga Jal Project 731.04 U.P. Jal Nigam<br />

8 Test Laboratory 1.08 U.P. Jal Nigam<br />

Total estimated cost 900.04<br />

The sewerage system in the city is inadequate. The city requires the augmentation of the<br />

system in the entire city and the purchase of modern equipments for desilting.<br />

S. No. Projects Proposed<br />

1 Augmentation of Sewerage System<br />

Table 15.14: Projects Cost estimate Sewerage<br />

a) Providing 129 Km. new sewer lines 3 Nos. major & 5 Nos.<br />

small pumping stations in Central Sewerage District<br />

b) 255 Km. sewer line 4 major and 4 small SPS and 105.00<br />

MLD STP in Western Sewerage District<br />

c) 61.40 Km. sewer line, 3 major and 3 small SPS and 26.00<br />

MLD STP in Eastern Sewerage District<br />

d) 147 Km. sewer lines 2 Nos. major and 10 nos. small<br />

pumping station and 38.00 MLD S.T.P. in Northern<br />

Sewerage District<br />

e) 63.40 km. sewer line, 2 major and 6 small SPS and 29.00<br />

MLD STP. in Southern Sewerage District-I<br />

f) 30.20 km. sewer line, 1 major and 1 small SPS and 29.00<br />

MLD STP. in Southern Sewerage District-II<br />

g) 342 Km. sewer line, 4 major & 7 small pumping stations and<br />

37.00 MLD STP in Tajganj Sewerage District<br />

Project Cost<br />

(in crores) Department<br />

98.70<br />

148.97<br />

72.35<br />

94.56<br />

79.01<br />

47.40<br />

221.08<br />

U.P. Jal Nigam