JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
City Development Plan for Agra City in the state of Uttar Pradesh under <strong>JNNURM</strong><br />
S. No. Projects Proposed<br />
139<br />
MDP Consultants in association with Allianz Securities Ltd.<br />
Project Cost<br />
(in crores) Department<br />
2 Purchase of Modern Equipment for Desilting of sewers 1.05 U.P. Jal Nigam<br />
15.2.5 Storm Water Drainage<br />
Total estimated cost 763.13<br />
The project cost for implementing various projects in this sector is Rs. 147.00. The projects<br />
proposed include the repair of existing drains, construction and purchase of equipment for<br />
desilting of drains.<br />
Table 15.15: Projects Cost estimate Storm Water Drainage<br />
S. No. Projects Proposed<br />
1 Repair of Existing drains Phase I (Desilting, repair and remodeling<br />
of existing drains)<br />
Ashok Nagar Branch, T.B. Hospital Branch, Moti Mahal Branch,<br />
Water Works Drain, Paliwal Drain, Khoja Drain, Pipal Mandi Drain,<br />
Taj West Drain, Madhu Nagar Drain, Shakti Nagar Drain, Nehru<br />
Nagar Drain, Tota-Ka-Tal (Existing) Drain, Naulakha Drain, Rui Ki<br />
Mandi Drain, Gyaspura Drain, Ram Bagh Chauraha, PWD Drain<br />
1.1 Construction of new drains Phase I<br />
Ram Nagar, Sur Sadan Ponding and Existing Bhairow Nalla, Mental<br />
Hospital Drain, Tot Ka Taal to manola via Loha Mandi,<br />
Shashtripuram (Sikandra Canal), Taj Nagri Phase II, Dewari Road,<br />
Nagla Baghel<br />
2 Repair of Existing drains Phase II<br />
Mantola Drain, V.I.P. Road (Sultanpura Drain), Naripura Drain,<br />
Tehri Bagia Area Drain (Radha Nagar Extension part of drain),<br />
Radha Nagar Drain, Sikandra to Yamuna River, Vayu Vihar Drain<br />
3 Construction of new drains Phase III<br />
Gwalior Road (LHS), Gwalior Road (RHS), Ashopa Hospital Drain,<br />
Transport Nagar Drain, Peelakhar Drain (New), Karmayogi Drain<br />
(New), Kamla Nagar C-Block Drain, Ashoka Enclave Road Drain,<br />
Sikandara to Guru Ka Tall, Etamad-Ud-Daulah Drain (F-C1 Branch),<br />
RBS College Drain<br />
3.1 Repair of Existing drains Phase III (Desilting, repair and<br />
remodeling of existing drains)<br />
Bijli Ghar Branch, Bhairon & Belanganj Drain, Ram Bagh Drain, Taj<br />
East Drain, Etamad-Ud-Daullah, Peelakhar Drain, Krishna Colony<br />
Drain, Balkeshwar Drain, Rajwaha Drain, Naunihai/Ind. Estate<br />
Drain, Kalinid Vihar Drain, Rajpur Chunghi Drain, Arjun Nagar<br />
Drain, Azambada Drain, Wazirpura Balmiki Basti Drain, St. Peters<br />
College Drain, Bapu Nagar Drain, Dayal Bagh Drain And its Branch,<br />
Karmayogi Drain, Muncipal Corporation Drain, Rajpura Drain,<br />
Bodhla Road Drain (Left And Right Side), Bagh Farzana Drain,<br />
Kothi Meena Bazar Main Drain, Chippitola Drain, Prabhu Cinema<br />
Drain, Anurag Nagar Drain, Mughal Road, Sector 4 main, Bipur<br />
Bazar, Water Works Chauraha, PWD Drain<br />
4 Purchase of Equipment for Desilting of drains<br />
15.2.6 Solid Waste Management<br />
Project Cost<br />
(in crores) Department<br />
80.94<br />
52.50<br />
32.90<br />
2.10<br />
Total estimated cost 168.44<br />
U.P. Jal Nigam<br />
U.P. Jal Nigam<br />
U.P. Jal Nigam<br />
There is no solid waste management system taking place in the city. The solid waste<br />
collection, transportation and disposal is not being done as per MSW rules. The projects<br />
proposed include the purchase of equipments & tools, vehicles, landfill sites, creating<br />
community awareness with the help of RWAs, NGOs, etc. and the approximate cost comes<br />
out to be Rs. 80.00 crores.