110<br />

In the <strong>Mediterranean</strong>, the average time<br />

months. Additionally, the grant<strong>in</strong>g of the lice<br />

build<strong>in</strong>g the facilities <strong>and</strong> beg<strong>in</strong>n<strong>in</strong>g the production process; depend<strong>in</strong>g on the species to be cultured,<br />

the time taken from the application (average time mentioned) to the first<br />

between 2.5 <strong>and</strong> 3.5 years 26 average time taken <strong>in</strong> the licens<strong>in</strong>g process has been estimated <strong>in</strong> 14<br />

months. Additionally, the grant<strong>in</strong>g of the license is just the start<strong>in</strong>g po<strong>in</strong>t to enable <strong>in</strong>itiation of<br />

facilities <strong>and</strong> beg<strong>in</strong>n<strong>in</strong>g the production process; depend<strong>in</strong>g on the species to be cultured,<br />

from the application (average time mentioned) to the first sale of the product coul could take<br />

. . In a global market market with with chang<strong>in</strong>g scenarios, three years years is a long period<br />

of time which plays aga<strong>in</strong>st aquaculture development.<br />

Figure 10 - Licens<strong>in</strong>g procedure procedure for for aquaculture: average average period period of of time time required required to to obta<strong>in</strong> obta<strong>in</strong> a license<br />

license<br />

Legend:<br />

Countries with with an average average time lower that 6 months to to obta<strong>in</strong> an<br />

an<br />

aquaculture license<br />

Countries with with an average average time between 6 <strong>and</strong> 8 months to to obta<strong>in</strong><br />

obta<strong>in</strong><br />

an aquaculture license<br />

Countries with an average time between 8 <strong>and</strong> 12 months to<br />

obta<strong>in</strong> an a aquaculture license<br />

Countries with an average time of 12 months<br />

Countries with an average time of 18 months<br />

Countries with an average time of 24 months<br />

GFCM:XXXV XXXV/2011/Dma.9<br />

Note: For Spa<strong>in</strong>, the average period is the result of the medium average taken by each<br />

regional government, overnment, which scored between 12 <strong>and</strong> 30 months 27 each<br />

.<br />

Us<strong>in</strong>g the fourteen month period as a benchmark, 57% of the countries surveyed have shorter periods<br />

of time than the average to obta<strong>in</strong> an aquaculture license, license these are: : Egypt, Croatia, Israel, Albania,<br />

26<br />

This period varies widely depend<strong>in</strong>g on the species cultured, the type of aquaculture <strong>in</strong>stallation, <strong>in</strong>stallation etc. The<br />

numbers presented are just estimates.<br />

27<br />

Data obta<strong>in</strong>ed from the National Strategic Plan for the Spanish Mar<strong>in</strong>e Aquaculture (MARM, 2008).