- Page 1 and 2: JLPL ESSAR OIL LPG PIPELINE CONNECT
- Page 3 and 4: SPECIAL CONDITIONS OF CONTRACT The
- Page 5 and 6: 2.6.3 Deduction at Source 2.6.3.1 P
- Page 7 and 8: 6.3 The materials, design, and work
- Page 9 and 10: (iv) The Contractor shall adhere to
- Page 11: 6.24 Insurance (For option - II & I
- Page 15 and 16: 3.4 Repair of defects on pipes reco
- Page 17 and 18: 4.0 SCOPE OF SUPPLY 4.1 Material to
- Page 19 and 20: all damages occurring and/or noted
- Page 21 and 22: GAIL (INDIA) LIMITED Material Requi
- Page 24 and 25: JLPL ESSAR OIL LPG PIPELINE CONNECT
- Page 26 and 27: CONTENTS Sl. No. Description 1.0 SC
- Page 28 and 29: 5.1.2 Welding Process 5.1.2.1.1 Con
- Page 30 and 31: LSAW pipes shall be mechanically co
- Page 32 and 33: 6.2.5 The minimum elongation of bas
- Page 34 and 35: 6.2.7.3 (New) 6.2.7.4 (New) Procedu
- Page 36 and 37: 7.8.2 Offset of Plate Edges 7.8.3 7
- Page 38 and 39: 9.2.1 Heat Analysis Where the steel
- Page 40 and 41: 9.8 Non - Destructive Inspection 9.
- Page 42 and 43: 9.8.5.1.1 (New) Seamless Pipe : 45
- Page 44 and 45: Location SEL - 072 Lamination Accep
- Page 46 and 47: 12.3 (New) 12.4 (New) hard copy rec
- Page 48 and 49: B.1.2 Weld Seam of Welded Pipe APPE
- Page 50 and 51: APPENDIX - F SUPPLEMENTARY REQUIREM
- Page 52 and 53: Representative. SR 17.3 Acceptance
- Page 54 and 55: ANNEXURE - I (NEW) MANUFACTURING PR
- Page 56 and 57: (2) of these specimens shall be tes
- Page 58 and 59: FIGURE 6.2.6.1 GAIL (INDIA) LIMITED
- Page 60 and 61: FIGURE 6.2.6.2(b) GAIL (INDIA) LIMI
- Page 62 and 63:
FIGURE 7.8.3 GAIL (INDIA) LIMITED C
- Page 64 and 65:
CONTENTS SL NO. DESCRIPTION 1.0 SCO
- Page 66 and 67:
13 ASTM G-42 : Tentative Methods fo
- Page 68 and 69:
week prior to its use, to establish
- Page 70 and 71:
Sl. No. Properties Units Requiremen
- Page 72 and 73:
(i) Details of plant(s), locations,
- Page 74 and 75:
A batch representing a normal produ
- Page 76 and 77:
(iii) Adhesive Layer Thickness Adhe
- Page 78 and 79:
(i) Surface cleanliness, surface ro
- Page 80 and 81:
specification. 8.6.2 The pipe tempe
- Page 82 and 83:
decision on rejection or re-blastin
- Page 84 and 85:
and/ or as per COMPANY representati
- Page 86 and 87:
9.2.11 Coating and/ or adhesive sha
- Page 88 and 89:
(iii) In case the above tests do no
- Page 90 and 91:
10.11 Cathodic Disbondment Test (i)
- Page 92 and 93:
11.6 The lorries used for transport
- Page 94 and 95:
All repairs carried out to coating
- Page 96 and 97:
COATING SYSTEM/ MATERIAL PREQUALIFI
- Page 98 and 99:
TABLE - 2 S.No Properties Frequency
- Page 100 and 101:
Name of bidder PRICE SCHEDULE FOR S
- Page 102 and 103:
ITEM NO OF MR ENCLOSURE TO PRICE SC
- Page 104 and 105:
Notes Price Schedule for the Coatin
- Page 106 and 107:
Notes Price Schedule for the Coatin
- Page 108 and 109:
Notes Price Schedule for the Coatin
- Page 110 and 111:
Notes Place of taking delivery of p
- Page 112 and 113:
JLPL ESSAR OIL PIPELINE CONNECTIVIT
- Page 114 and 115:
ITEM NO OF MR ENCLOSURE TO PRICE SC
- Page 116:
PRICE SCHEDULE FOR COATED LINE PIPE