all damages occurring and/or noted after taking over the delivery of linepipes shall<br />
be to the Contractor's account.<br />
5.8 At the time of handing over to Installation Agency at dumpsite, the bare and<br />
coated pipes shall be inspected visually and using holiday detection methods by the<br />
Contractor in the presence of Owner's representative for damages occurring to<br />
pipes and/ or coating during handling and transportation. COATING Contractor<br />
shall repair all such defects recorded at the time of handing over to Installation<br />
Agency and all such repairs shall be to Contractor's account. Contractor shall<br />
handover only good pipes to Installation Agency. All handling, lifting etc. required<br />
for inspection of pipes shall be carried out by the Contractor. Contractor shall<br />
engage adequate number of manpower required during handing over of<br />
bare/coated pipes to Installation Agency. Contractor shall hand over the<br />
coated/bare pipes to Installation Agency progressively based on construction<br />
requirement. Contractor shall load the coated/bare pipes on to the truck/trailer<br />
(provided by Installation Agency) at the time of handing over.<br />
5.9 A typical layout of dumpsite, sketch no. Coating & Transportation –Scope of work<br />
(page 10 of 10) is enclosed with tender for reference purposes.<br />
5.10 The bare/coated pipes within the dumpsite may be stacked by placing them on<br />
ridges of sand, free from stones and covered with a plastic film including supply of<br />
sand and other materials. The cover may consist of dry, germ free straw with a<br />
plastic film, otherwise foam rubber shall be used. The support shall be spaced in<br />
such a manner so as to avoid permanent bending of the pipes. Bare pipe stacks<br />
shall consist of limited number of layers such that deformation of the pipe is<br />
avoided. In case of coated pipes, stacks shall consist of limited number of layers so<br />
that the pressure exercised by the pipe's own weight does not cause deformation<br />
of the line pipe / damages to coating. Each section shall be separated by means of<br />
spacers suitably spaced for this purpose. The weld bead of pipes shall be<br />
positioned in such a manner so as not to touch the adjacent pipes. Coated pipes<br />
stacked in open shall be suitably covered on top to decrease direct exposure to<br />
sunlight.<br />
5.11 A coating specialist shall be made available during entire duration of coating works.<br />
5.12 Coating wastage generated due to standard cut backs shall be the property of the<br />
Contractor and shall be disposed off by the Contractor. For the purpose of<br />
measurement of coated lengths, cut back length shall also be considered as coated<br />
length and shall be paid accordingly.<br />
6.0 LIST OF SPECIFICATIONS AND DRAWINGS<br />
Following specifications are enclosed herewith :<br />
1. Technical Specification for 3-layer Polyethylene Coating<br />
(Spec no. : <strong>GAIL</strong>-TS-COATING-3LPE )<br />
2 Typical layout plan for dumpsite development<br />
3 Material requisition for line pipes<br />
<strong>GAIL</strong> (INDIA)<br />
LIMITED<br />
COATING &<br />
TRANSPORTATION<br />
SCOPE OF WORK<br />
- 7