CONTRACTOR shall install requisite equipment and plant in roofed and adequately<br />

weather protected areas.<br />

3.2 Plant equipment, machinery and other facilities shall be in first class operating<br />

condition to atleast meet the job requirements of quality and production. Worn out<br />

and improvised plants are not acceptable.<br />

3.3 CONTRACTOR shall, at his own responsibility and cost, provide and prepare all<br />

necessary area for the storage of bare and coated pipe and all other materials, for<br />

coating yard, stock-piling and other temporary installation. For each area,<br />

CONTRACTOR shall provide to stipulate servitude agreements as required with the<br />

relevant Authorities, and, on work completion, to clean, restore and pay servitude and<br />

claims for damages, as applicable.<br />

3.4 CONTRACTOR shall at its own responsibility and cost, provide for water and power<br />

supply and other utilities and consumables and obtain authorisation regarding access<br />

roads and other permits required for the execution of works conforming to all the<br />

requirements of the governing authorities.<br />

3.5 CONTRACTOR shall at its own expense provide a fully equipped laboratory and test<br />

facilities with adequate inventory to carry out tests required for the procedure<br />

qualification and during regular production. Outside testing for qualification and<br />

regular production is not acceptable to COMPANY.<br />

3.6 The CONTRACTOR shall be fully responsible for adherence to all statutory regulations<br />

applicable for handling and disposal of the hazardous chemicals during the coating<br />

works.<br />

3.7 The CONTRACTOR shall be responsible for obtaining all statutory approvals/<br />

clearances from relevant Authorities including Pollution Control Board, as applicable<br />

for the coating plant(s).<br />

4.0 MATERIALS<br />

4.1 The three layer coating system shall comprise of a powder epoxy primer, polythylene<br />

adhesive and a polyethylene top coat. Coating materials shall be suitable for the<br />

service conditions and the pipe sizes involved. The coating materials i.e. epoxy<br />

powder, adhesive and polyethylene compound shall have proven compatibility. The<br />

coating system and materials shall be pre-qualified and approval COMPANY in<br />

accordance with provision Annexure-I of this specification. CONTRACTOR shall obtain<br />

prior approval from COMPANY for the coating system and coating materials.<br />

4.2 The coating materials Manufacturer shall carry out tests for all properties specified in<br />

para 5.3.1 and 5.3.2 for each batch of epoxy, adhesive and polyethylene compound.<br />

In addition, the Manufacturer shall also furnish Infra-red Scan for each batch of epoxy<br />

powder. The coating materials manufacturer shall issue test certificates as per DIN<br />

EN 10204, 3.1B for each batch of materials supplied to CONTRACTOR and the same<br />

shall be submitted to COMPANY for approval prior to their use.<br />

4.3 In addition to Manufacturer’s certificate, the CONTRACTOR shall draw samples<br />

from each batch of epoxy, adhesive and polyethylene in the presence of COMPANY<br />

Representative and test for the following properties at the coating yard at least one<br />

<strong>GAIL</strong> (INDIA) LIMITED<br />

3 – LAYER POLYETHYLENE<br />

COATING OF LINEPIPES<br />

<strong>GAIL</strong>-TS-COATING-3LPE<br />

Page 4 of 35