5.0 OTHER REQUIREMENTS<br />

5.1 The coating plant, equipment, machinery and other facilities shall be in good<br />

operating condition to meet the job requirement of quality and production. Worn<br />

out or improvised plant is not acceptable. The coating plant for the work shall be of<br />

size and capacity that shall be suitable for the scale of the work production rate &<br />

time schedule specified elsewhere in the document.<br />

5.2 Contractor shall, at his own responsibility and cost, provide and prepare all<br />

necessary area for the storage of pipes and all other materials for coating yard,<br />

stock piling, and other temporary installation. Contractor shall provide necessary<br />

agreements as required with the relevant authorities/land owners, and on work<br />

completion, to clean, restore and pay settlements and claim for damages.<br />

5.3 Contractor shall, at his own responsibility and cost, arrange all necessary land/area<br />

for dumpsite for the storage of coated/bare pipes, approach road and all other<br />

equipments and materials, stock piling and other temporary installation. Contractor<br />

shall make necessary agreements as required with the relevant authorities/land<br />

owners, and on work completion, to clean, restore and pay settlements, and claim<br />

for damages. Restoration and handing over of dumpsite land shall be the<br />

responsibility of Contractor.<br />

5.4 Contractor shall, at his own responsibility and cost, provide water and power<br />

supply and other utilities, obtain permit regarding access roads and other permits<br />

required for the execution of works conforming to all the requirements of the<br />

governing authorities.<br />

5.5 Contractor shall, at his own expenses, provide a fully equipped laboratory and test<br />

facilities with adequate inventory to carry out tests required for the procedure<br />

qualification and during regular production.<br />

5.6 All handling, loading, unloading, stacking / storing shall be done in such a manner<br />

as to minimize mechanical damages & corrosion and as per the procedure<br />

approved by the Owner.<br />

(i) All handling shall be done with slings or padded hooks.<br />

(ii) Trailers shall be cleaned of debris or any other substance that might<br />

damage the pipe.<br />

(iii) Suitable timber and other dunnage shall be used to protect the pipes<br />

against the damage during transit.<br />

(iv) Loading shall be done in accordance with API RP 5L1 and procedure<br />

approved by the Owner.<br />

(v) Finished pipe to be stored for a significant period of time in the coating<br />

yard in a manner to prevent corrosion and damages to the coating.<br />

5.7 At the designated place of issue of bare Linepipes by Owner, the Contractor shall<br />

perform visual inspection of the bare pipes in the presence of Owner representative<br />

at the time of "taking over" and all damages shall be recorded. These defects will<br />

be repaired by Contractor as per rates set forth in the tender document. Repair of<br />

<strong>GAIL</strong> (INDIA)<br />

LIMITED<br />

COATING &<br />

TRANSPORTATION<br />

SCOPE OF WORK<br />

- 6