6.10 Transportation<br />
The following shall be read in conjunction with Article -17 of General Conditions of Contracts<br />
-Goods<br />
6.10.1 Under Option-<strong>II</strong> & <strong>II</strong>I, transportation up to warehouse shall be the responsibility of Indian as<br />
well as Foreign Bidder.<br />
6.10.2 In case of Domestic Bidders, under OPTION-I the loading of the pipes on trailer arranged by<br />
PE Coating Contractor shall be the responsibility of Domestic Bidder.<br />
6.10.3 In case of order on Foreign bidder under option –I, the coating contractor shall receive and<br />
take –over the Linepipes at designated port (from the ship’s crane hook). All charges including<br />
port charges in India including charges for off loading the cargo on coating contactor trailers<br />
and un slinging of hooks shall be on employer’s account the loading of the pipes on trailer shall<br />
be responsibility of PE coating contractor.<br />
6.11 Following steel plate/ coil manufacturers are acceptable for the procurement of steel plates/<br />
coils to be used in the manufacture of line pipes.<br />
(i) Essar Steel, India<br />
(ii) Ispat Industries Ltd., India<br />
(iii) SAIL, Bokaro, India<br />
(iv) Thyssen Krupp, Germany<br />
(v) Mannesmann Salzgitter Roehrenwerke, Germany<br />
(vi) Dillinger Huette, Germany<br />
(vii) Europipe, Germany<br />
(viii) Ilva (Riva Group), Italy<br />
(ix) Azovstal, Ukraine<br />
(x) Posco, South Korea<br />
(xi) Voest Alpine, Austria<br />
(xii) Nippon Steel, Japan<br />
(xiii) AHMSA (Altos Homos de Mexico), Mexico<br />
(xiv) JSW Steel Ltd , India<br />
(xv) Lloyd Steel ,India<br />
(xvi) Saudi Iron & Steel (Hadeed),Saudi Arabia<br />
(xvii) Wuhan Iron & Steel Corporation ,China<br />
6.12 PE Coating (For MR Option-<strong>II</strong> & <strong>II</strong>I only)<br />
6.12.1 Quality Assurance/ Quality Control<br />
(i) Bidder shall include in his offer the Quality Assurance Programme containing the<br />
overall quality management and procedures, which is required to be adhered to<br />
during the execution of contract. After the award of the contract detailed quality<br />
assurance programme shall be prepared by the Bidder for the execution of contract<br />
for various works, which will be mutually discussed and agreed to.<br />
(ii) The Bidder shall establish document and maintain an effective quality assurance<br />
system outlined in recognized codes.<br />
(iii) Quality Assurance System plans/ procedures of the Bidder shall be furnished in the<br />
form of a QA manual. This document should cover details of the personnel<br />
responsible for the Quality Assurance, plans or procedures to be followed for quality<br />
control in respect of Design, Engineering, Procurement, Supply, Inspection, Testing<br />
and Commissioning. The quality assurance system should indicate organizational<br />
approach of quality control and quality assurance of the construction activities, at all<br />
stages of work at manufacture's works and dispatch of materials.<br />
<strong>GAIL</strong> (INDIA) LIMITED<br />
New Delhi<br />
Special Conditions of Contract<br />
7 of 10