4.0 SCOPE OF SUPPLY<br />

4.1 Material to be supplied by the Owner as Free-Issue<br />

4.1.1 Owner shall make available to the contractor , the following bare line pipes , for<br />

application of External 3-layer Side Extruded Polyethylene Coating , at owner’s<br />

designated place(s) of issue at an appropriate time during execution stage.<br />

S.No. OD X WT<br />

(mm) X (mm)<br />

<strong>GAIL</strong> (INDIA)<br />

LIMITED<br />

COATING &<br />

TRANSPORTATION<br />

Material<br />

API 5L Gr<br />

Quantity<br />

(meters)<br />

1 6 5/8 X 6.4 B 175000<br />

4.2 Materials to be supplied by the Contractor<br />

Contractor shall be responsible for the procurement and supply, in sequence and at<br />

the appropriate time, of all materials including corrosion coating materials, repair<br />

materials , all accessories , consumables and utilities required for completion of the<br />

works as defined in this document except the Owner supplied materials specifically<br />

listed under para 4.1 above as Owner’s free-issue material. The rates quoted for the<br />

execution of the work shall be inclusive of supply of these materials. All materials<br />

supplied by the Contractor shall be strictly in accordance with the requirements of<br />

applicable Owner’s specification enclosed with the tender document. Contractor shall<br />

procure all coating material only from manufacturers as mentioned in tender<br />

document.<br />

Material to be supplied by the Contractor shall include but not limited to the following:<br />

(i) All materials and equipment required for repair, rebevelling and / or cutting<br />

out of defects of bare pipes.<br />

(ii) All consumables, equipment required for surface cleaning / preparation etc.<br />

including chemical treatment.<br />

(iii) All materials, equipment, consumables as required for external 3-layer side<br />

extruded polyethylene coating of Pipes.<br />

(iv) All materials and equipment required for conducting all types of inspection<br />

and tests including non destructive testing of pipes after rebevelling/grinding<br />

(v) All materials and equipment required for repairing of defects of coated pipes<br />

and thereafter retesting.<br />

(vi) All equipment, materials, tools, tackles, devices required for loading,<br />

transportation, hauling, handling, unloading, stacking, and storage of bare /<br />

coated pipes including sand for pipe stacking.<br />

(vii) Any other items not mentioned above but are required for timely completion<br />

of work in all respect.<br />

SCOPE OF WORK<br />