INSPECTION OF FIELD TEST AND WARRANTY<br />
Purchaser shall be reimbursed by Manufacturer for any pipe furnished on this order that fails under<br />
field hydrostatic test if such failure is caused by a material / manufacturing defect in the pipe. The<br />
reimbursement cost shall include pipe, labour and equipment rental for finding, excavating, cutting<br />
out and installation of replaced pipe in position. The field hydrostatic test pressure will not exceed that<br />
value which will cause a calculated hoop stress equivalent to 95 percent of specified minimum yield<br />
strength (SMYS).<br />
In case Manufacturer so desires, he will be advised at least two week in advance so that his<br />
representative may witness the hydrostatic test in field. However, the testing and leak finding<br />
(if any) and repair operation shall not be postponed because of absence of the Manufacturer’s<br />
Representative.<br />