04.08.2013 Views

Volume-II - GAIL

Volume-II - GAIL

Volume-II - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONTENTS<br />

Sl. No. Description<br />

1.0 SCOPE<br />

2.0 REFERENCES<br />

5.0 PROCESS OF MANUFACTURE AND MATERIAL<br />

6.0 MATERIAL REQUIREMENTS<br />

7.0 DIMENSIONS, WEIGHTS, LENGTHS, DEFECTS, AND END FINISHES<br />

9.0 INSPECTION AND TESTING<br />

10.0 MARKING<br />

11.0 COATING AND PROTECTION<br />

12.0 DOCUMENTS<br />

13.0 PIPE LOADING<br />

14.0 (New) INSPECTION OF FIELD TEST AND WARRANTY<br />

APPENDIX-B : REPAIR OF DEFECTS BY WELDING (NORMATIVE)<br />

APPENDIX-C : REPAIR WELDING PROCEDURE (NORMATIVE)<br />

APPENDIX-F : SUPPLEMENTARY REQUIREMENTS (NORMATIVE)<br />

SR-5 : FRACTURE TOUGHNESS TESTING (CHARPY V-NOTCH)<br />

SR-6 : DROP WEIGHT TEAR TESTING (DWTT) ON WELDED PIPE<br />

SR-17 : NON DESTRUCTIVE INSPECTION OF WELDS IN ELECTRIC WELDED<br />

PIPE AND LASER WELDED PIPE<br />

SR-19 : ADDITIONAL FRACTURE TOUGHNESS REQUIREMENTS<br />

(TRANSVERSE CHARPY V- NOTCH) FOR PSL – 2 PIPE<br />

APPENDIX-H : PURCHASER INSPECTION (NORMATIVE)<br />

ANNEXURE-I (NEW) : MANUFACTURING PROCEDURE SPECIFICATIONS<br />

ANNEXURE-<strong>II</strong> (NEW) : FIRST DAY PRODUCTION TESTS<br />

ANNEXURE-<strong>II</strong>I (NEW) : INFORMATION TO BE FURNISHED AT THE TIME OF BIDDING<br />

FIGURE : 6.2.6.1<br />

FIGURE : 6.2.6.2 (a)<br />

FIGURE : 6.2.6.2 (b)<br />

FIGURE : 6.2.7<br />

FIGURE : 7.8.3<br />

<strong>GAIL</strong> (INDIA) LIMITED CARBON STEEL LINE PIPES <strong>GAIL</strong>-TS-LINEPIPE-CS<br />

Page 1 of 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!