Volume-II - GAIL
Volume-II - GAIL
Volume-II - GAIL
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CONTENTS<br />
Sl. No. Description<br />
1.0 SCOPE<br />
2.0 REFERENCES<br />
5.0 PROCESS OF MANUFACTURE AND MATERIAL<br />
6.0 MATERIAL REQUIREMENTS<br />
7.0 DIMENSIONS, WEIGHTS, LENGTHS, DEFECTS, AND END FINISHES<br />
9.0 INSPECTION AND TESTING<br />
10.0 MARKING<br />
11.0 COATING AND PROTECTION<br />
12.0 DOCUMENTS<br />
13.0 PIPE LOADING<br />
14.0 (New) INSPECTION OF FIELD TEST AND WARRANTY<br />
APPENDIX-B : REPAIR OF DEFECTS BY WELDING (NORMATIVE)<br />
APPENDIX-C : REPAIR WELDING PROCEDURE (NORMATIVE)<br />
APPENDIX-F : SUPPLEMENTARY REQUIREMENTS (NORMATIVE)<br />
SR-5 : FRACTURE TOUGHNESS TESTING (CHARPY V-NOTCH)<br />
SR-6 : DROP WEIGHT TEAR TESTING (DWTT) ON WELDED PIPE<br />
SR-17 : NON DESTRUCTIVE INSPECTION OF WELDS IN ELECTRIC WELDED<br />
PIPE AND LASER WELDED PIPE<br />
SR-19 : ADDITIONAL FRACTURE TOUGHNESS REQUIREMENTS<br />
(TRANSVERSE CHARPY V- NOTCH) FOR PSL – 2 PIPE<br />
APPENDIX-H : PURCHASER INSPECTION (NORMATIVE)<br />
ANNEXURE-I (NEW) : MANUFACTURING PROCEDURE SPECIFICATIONS<br />
ANNEXURE-<strong>II</strong> (NEW) : FIRST DAY PRODUCTION TESTS<br />
ANNEXURE-<strong>II</strong>I (NEW) : INFORMATION TO BE FURNISHED AT THE TIME OF BIDDING<br />
FIGURE : 6.2.6.1<br />
FIGURE : 6.2.6.2 (a)<br />
FIGURE : 6.2.6.2 (b)<br />
FIGURE : 6.2.7<br />
FIGURE : 7.8.3<br />
<strong>GAIL</strong> (INDIA) LIMITED CARBON STEEL LINE PIPES <strong>GAIL</strong>-TS-LINEPIPE-CS<br />
Page 1 of 37