ANP PROJECT QUARTERLY PROGRESS REPORT<br />
CREEP UNDER IRRADIATION<br />
W. W. Davis J. C. Wilson<br />
J. c. Zukas<br />
Solid State Division<br />
Additional cantilever creep tests<br />
on Inconel with <strong>the</strong> standard ARE 2-hr,<br />
1100°F anneal were carried out a t<br />
1500°F in air atmospheres in <strong>the</strong><br />
graphite reactor and <strong>the</strong> LITR. As<br />
shown in Figs. 14.1 and 14.2, <strong>the</strong>re<br />
are only small differences between <strong>the</strong><br />
bench and in-reactor tests. The upward<br />
deflection after 400 hr in <strong>the</strong> curve<br />
for <strong>the</strong> 3000-psi test in <strong>the</strong> ORNL<br />
graphite reactor is probably due to<br />
faulty operation of <strong>the</strong> temperature<br />
controller. The results are to be<br />
checked by postirradiation measure-<br />
ments of <strong>the</strong> creep deflections 011 a<br />
remotely con tro 11 ed pro fi lome ter.<br />
188<br />
-BENCH TEST<br />
Postirradiation measurements were<br />
made on specimens annealed at 1650°F<br />
and irradiated in <strong>the</strong> graphite reactor<br />
at 1500°F. Their creep curves were<br />
shown in a previous report(') as curve<br />
A, 1500 psi, and curve C, 2000 psi.<br />
The profilometer measurements indicated<br />
that. <strong>the</strong> large extensions which were<br />
measured were in error and that <strong>the</strong><br />
actual extensions were not much<br />
greater than those occurring in <strong>the</strong><br />
bench tests. Several tests reported<br />
last quarter as being in progress were<br />
negated by faulty microformers.<br />
The design for <strong>the</strong> bellows-loaded<br />
tensile creep test, in <strong>the</strong> MTR is near-<br />
ing completion, and most, of <strong>the</strong> com-<br />
ponents have been fabricated and<br />
partly assembled for test.<br />
(').I. C. Wilson. J. C. Zukas, and W. W. Davis,<br />
ANP Quar. Frog. Rep. June 10, 1952, ORNL-1294.<br />
p. 164.<br />
SSD-A-499<br />
DWG. i 7037A<br />
0 200 400 600<br />
TIME (hr)<br />
Fig. 14.1. Cantilever Creep Tests on Ineonel in Air at 1500"~ and is00 psi.