- Page 2 and 3: __~ ~ ~~~ . ......... ~ ..... - ...
- Page 4 and 5: 98- 108. 109. 110- 117. 118. 119-12
- Page 8 and 9: SUMMARY AND INTRODUCTION e a e e .
- Page 10 and 11: PAG9 Air-Scattering Experiments ...
- Page 12 and 13: 12 . PAGE Compatibility of Be0 in K
- Page 14: -- PAGE . ...... Optical Properties
- Page 20 and 21: SUMMARY AND The Aircraft Heactor Ex
- Page 22 and 23: 1. CIRCULATING-FUEL A few relativel
- Page 24: m- u u: L m gF& /--,-.- 4 FOE HEAT
- Page 27 and 28: ANP PROJECT QUARTERLY PROGRESS REPO
- Page 29 and 30: I REACTOR POWER, 3 mv OPERATING TIM
- Page 31 and 32: ANP PROJECT QUARTERLY PROGRESS REPO
- Page 33 and 34: ANP PROJECT QUARTERLY PROGRESS REPO
- Page 35 and 36: ANP PROJECT QUARTERLY 80 -. . PROGR
- Page 37 and 38: 22 h w 0 w ffi 4 ANP PROJECT QUARTE
- Page 39 and 40: ANI' PROJECT QUARTERLY PROGRESS REP
- Page 41 and 42: ANP PROJECT QUARTERLY PROGRESS REPO
- Page 43 and 44: ANP PROJECT QUARTERLY PROGRESS REPO
- Page 45 and 46: ANP PROJECT QUARTERLY PROGRESS REPO
- Page 47 and 48: AR'P PROJECT QUARTERLY PWOGFWSS REP
- Page 49 and 50: ANP PROJECT QUARTERLY PROGRESS REPO
- Page 51 and 52: RADIATOR TYPE A B c D E F G N I J K
- Page 53 and 54: ANP PROJECT QUARTERLY PROGRESS REPO
- Page 55 and 56: ANP PROJECT QUARTERLY PROGRESS REPO
- Page 57 and 58:
ANP PROJECT QUARTERLY PROGRESS REPO
- Page 59 and 60:
ANP PROJECT QUARTERLY PROGRESS REPO
- Page 61 and 62:
ANP PROJECT QUARTERLY PROGRESS EEEP
- Page 63 and 64:
ANP PROJECT QUARTERLY PHOGWESS REPO
- Page 65 and 66:
ANP PROJECT QUARTERLY PROGRESS REPO
- Page 67 and 68:
ANP PRO.JECT QUARTERLY PROGRESS REP
- Page 69 and 70:
ANP PROJECT QUARTERLY PHOGRESS REPO
- Page 71 and 72:
ANP PROJECT QUARTERLY PROGRESS REPO
- Page 76 and 77:
The Lid Tank Facility bas been appl
- Page 78 and 79:
63 Y) 0, a 0 ICI 0 rn Y e 3 0 k e 0
- Page 80 and 81:
3x 10 2 ID 5 2 I 5 2 10-1 5 2 PERIO
- Page 82 and 83:
2 I o3 5 2 102 - L L: , a - E 5 w 2
- Page 84 and 85:
PERIOD ENDING DECEMBER 10, 1952 Air
- Page 86 and 87:
SOURCE Fig. 6.8. Geometry for Calcu
- Page 88 and 89:
4 W 160 140 I20 100 80 60 40 20 0 1
- Page 90 and 91:
PERIOD ENDING DECEMBER 10, 1952 DIS
- Page 92 and 93:
Figure 6. 8 is R photograph of t le
- Page 94 and 95:
40 45 50 55 60 65 70 y, HORIZONTAL
- Page 96 and 97:
1 o-' 5 2 1 o-?. 5 2 ' i I -- .....
- Page 98 and 99:
i o6 5 5 2 5 2 io2 PERIOD ENDING DE
- Page 100 and 101:
J. L. Meem R. G. Cochran M. P. Hayd
- Page 102 and 103:
Fig. Angle. PERIOD ENDING DECEMBER
- Page 104 and 105:
IO* io Be0 REFLECTOR FOR OIVIDED-SH
- Page 106 and 107:
- t + g $ - 108 I o7 PERIOD ENDING
- Page 108:
c P 8 M .rl Lr. I w l- l- R C m B e
- Page 111 and 112:
ANP PROJECT QUAHTEWLY PROGRESS REPO
- Page 113 and 114:
0 V In D 0 a:
- Page 118 and 119:
The research on fused fluoride syst
- Page 120 and 121:
PERIOD ENDING DECEMBEM 10. CHEMISTR
- Page 122 and 123:
cooling or the *'end of melting" on
- Page 124 and 125:
vapor; however, nickel vessels have
- Page 126 and 127:
through a minimum at about 90% NaBF
- Page 128 and 129:
1100 1000 900 BOO 700 600 500 400 -
- Page 130 and 131:
system until the LiF-ZrF, system is
- Page 132 and 133:
o X-RAY PATTERN OBTAINED AT THESE C
- Page 134 and 135:
arbitrarily selected and the total
- Page 136 and 137:
Fig. 10.7. Closed-System Batch-Filt
- Page 138 and 139:
purified fuel mixtures and one appa
- Page 140 and 141:
PERIOD ENDPRG DECEMBER 10, 1952 low
- Page 142 and 143:
1 1. CORlROS ION RESEARCH PERIOD EN
- Page 144 and 145:
PERIOD ENDING DECEMBER 10, 1952 Fig
- Page 146 and 147:
Additions of NaK cannot be recommen
- Page 148 and 149:
650°C. One specimen came out with
- Page 150 and 151:
PERIOD ENDING DECEMBER 10, 1952 Fig
- Page 152 and 153:
. * * 4 PERIOD ENDING DECEMBER 10,
- Page 154 and 155:
in the crevices, but a considerable
- Page 156 and 157:
BYDROX XDE CORROSION D. c. Vreeland
- Page 158 and 159:
TEMPERATURE GRADIENT 800°C - BOTTO
- Page 160 and 161:
corrodant under isothermal conditio
- Page 162 and 163:
A1 203 Si C MgO PERIOD ENDJNG DECEM
- Page 164 and 165:
QUARTZ DISK 12 in. 1 PERIOD ENDING
- Page 166 and 167:
loop in which sodium was circulated
- Page 168 and 169:
investigation of the oxidation of f
- Page 170 and 171:
Additional studies on the cone-arc
- Page 172 and 173:
for 5 min at 3000 psi at 1150, 1200
- Page 174 and 175:
_LI__ - TEMPERATURE -- ("C) 400 600
- Page 176 and 177:
less steel are being made in the fl
- Page 178 and 179:
PERIOD ENDING DECEMBER 10, 1952 Fig
- Page 180 and 181:
well as in the tube-to-header joint
- Page 182 and 183:
PERIOD ENDING DECEMBER 10, 1952 Fig
- Page 184 and 185:
sample tested for 100 hr at 1500°F
- Page 186 and 187:
at the Kicrobrazing temperature of'
- Page 188 and 189:
fuchsin dye for 12 hr, and specimen
- Page 190 and 191:
mixture NaF-EeF:, (57-43 mole XI. T
- Page 192 and 193:
0.2 PERIOD ENDING DECEMBER 10, 1952
- Page 194 and 195:
TABLE 13.3. VAPOR PRESSURE OF NaZpF
- Page 196 and 197:
expected in the reflector and shell
- Page 198 and 199:
PERIOD ENDING DECEMBER 10, 11952 UN
- Page 200 and 201:
P same way as it has been done for
- Page 202 and 203:
irradiated materials are now being
- Page 204 and 205:
P c v # z z W I- X W 0.14 0.12 0.10
- Page 206 and 207:
its water content can be determined
- Page 208 and 209:
method can be utilized to determine
- Page 210:
of the sample in acid was employed.
- Page 215 and 216:
ANP PROJECT QUARTERLY PROGRESS REPO
- Page 217 and 218:
ANP PROJECT QUARTERLY PMOGRESS REPO
- Page 219 and 220:
ANP PROJECT QUARTERLY rwxmss REPQRT
- Page 221 and 222:
ANP PROJECT QUARTERLY PROGRESS REPO
- Page 223 and 224:
ANP PROJECT QUARTERLY PROGRESS REPO
- Page 225:
STAFF ASSISTANT FOR FBGINEERING HES