ANP PROJECT QUARTERLY PROGRESS REPORT<br />

The first production model of <strong>the</strong> The wiring diagram for <strong>the</strong> control<br />

servo amplifier has been tested with system has been completed and working<br />

<strong>the</strong> ORNL Power Plant Simulator, and drawings for <strong>the</strong> relay panels, con-<br />

it proved to be satisfactory. This sole, and chamber installation have<br />

test was made with <strong>the</strong> actual com- .heen issued to <strong>the</strong> field.<br />

ponents, or duplicates, to be used in<br />

<strong>the</strong> ARE. A memorandum describing <strong>the</strong><br />

(7)E. R. Mnnn. J. J. Stone, end S. H. Hanover,<br />

on-off Servo for <strong>the</strong> ARE is being An On-Off Servo for <strong>the</strong> ARB, ORNL CF-52-11-228 (to<br />

prepared. ( ') be published).<br />