CONSTRUCTION AND MINING TECHNIQUE<br />
CONSTRUCTION AND MINING TECHNIQUE<br />
The mark of quality<br />
is customer satisfaction<br />
<strong>Atlas</strong> <strong>Copco</strong> Wagner believes that one measurement of quality is response to<br />
customer needs and demands. One critical demand from the customer’s point<br />
of view is the mechanical availability of the equipment required to meet their<br />
project deadlines. To support this demand, <strong>Atlas</strong> <strong>Copco</strong> offers its customers a<br />
maintenance, service and spare parts program.<br />
According to the program, <strong>Atlas</strong> <strong>Copco</strong> promises to service and<br />
maintain the equipment 24 hours a day, 7 days a week, from start<br />
to finish of the project. <strong>Atlas</strong> <strong>Copco</strong> provides the mechanics,<br />
training, labor, and spare parts needed to keep the vehicles operating<br />
and to meet the guaranteed mechanical availability, which<br />
allows projects to be completed on time.<br />
One case in which this full-service Parts and Maintenance<br />
Agreement led to customer satisfaction was in the Philippines.<br />
Wagner met the challenge of providing 22 Load-Haul-Dump<br />
vehicles (LHDs) and trucks to Raytheon-Ebasco Overseas<br />
54 ATLAS COPCO <strong>1999</strong><br />
Ltd., the principal contractor on the San Roque Multi-Purpose<br />
Dam Project in San Manuel, Philippines. The only way<br />
the contractor could be assured of completing a critical part<br />
of the tunneling was to have 95 percent mechanical availability<br />
for the operating units. To make that type of commitment,<br />
<strong>Atlas</strong> <strong>Copco</strong> offered Raytheon-Ebasco a full-service Parts and<br />
Maintenance Agreement that ensured the units were ready to<br />
work when the contractor was ready for mucking and hauling.<br />
The units’ reliability and performance allowed them to meet<br />
the project deadlines.