St. Charles County Transportation Plan 2030 - East-West Gateway ...
St. Charles County Transportation Plan 2030 - East-West Gateway ...
St. Charles County Transportation Plan 2030 - East-West Gateway ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Period 2011-2020<br />
I-64 - Construct new bridge over Missouri River for westbound traffic<br />
Period 2021 - <strong>2030</strong><br />
I-70 - Revise interchanges from Zumbehl Rd. to Rt. 79<br />
I-70 - Revise interchange at Rt. K<br />
I-70 - Add lanes from Rt. Z to Pearce Blvd.<br />
B-3. Illustrative Projects<br />
Other projects proposed by MoDOT are on the <strong>Plan</strong>’s “Illustrative Projects” list. These are projects<br />
they plan to build if funds become available. They are shown in Table 6.8 of the <strong>Plan</strong> and below.<br />
I-70 - Add lanes from Pearce Blvd. to Rt. T at Foristell<br />
I-70 - Construct new interchange at Rt. T at Foristell<br />
U.S. 61 - Upgrade to Interstate standards from Rt. A to Lincoln <strong>County</strong><br />
Rt. 94 - Construct additional lanes from Rt. 370 to Rt. B<br />
Rt. N - Widen to three lanes from west of U.S. 40/61 to Rt. Z<br />
Rt. Z - Widen to three lanes from I-70 to Rt. N<br />
B-4. Corridor <strong>St</strong>udies<br />
A number of major corridors in <strong>St</strong>. <strong>Charles</strong> <strong>County</strong> have been identified by MoDOT as warranting<br />
a corridor study in the future. Although funding is not available at this time for any improvements,<br />
corridor studies can be performed at any time in order to determine what type of improvement would<br />
be required, where it should be, how soon it would be needed, and how it would be funded. Five<br />
corridors have been identified by MoDOT as warranting study. They are as follows.<br />
• Rt. 79 from I-70 to Lincoln <strong>County</strong><br />
• Rt. K from I-64 to I-70<br />
• Rt. M from I-70 to Rt. 79<br />
• Rt. P from Rt. M to U.S. 61<br />
• Rt. Z from I-70 to Rt. N<br />
B-5. Interstate 70 Corridor, Kansas City to <strong>St</strong>. Louis, Missouri<br />
One corridor project of particular significance is I-70 from Kansas City to <strong>St</strong>. Louis. Because of its<br />
magnitude, MoDOT first conducted a Feasibility <strong>St</strong>udy in 1999. The study provided an estimation<br />
of the future needs of the corridor, feasible solutions, and recommendations for future action. In<br />
order to meet federal requirements, MoDOT initiated the “First Tier”of a Draft Environmental<br />
Impact <strong>St</strong>atement (DEIS). This first phase of the DEIS, completed in 2001, considered a number<br />
of approaches to improving the safety and efficiency of travel in the corridor from Kansas City to<br />
83