Technical Reports Parts C,D - ICPDR
Technical Reports Parts C,D - ICPDR
Technical Reports Parts C,D - ICPDR
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
124 Danube Pollution Reduction Programme – National Review, Ukraine<br />
<br />
3. establishing norms and amounts of payments for water use in hydropower<br />
generation and water transportation;<br />
4. granting tax, credit and other privileges to water users if they implement low-waste,<br />
waste-free, energy- and resource-saving technologies, perform other measures in<br />
compliance with legislation that reduce negative effect on waters;<br />
5. compensation of damage for water bodies resulting from violation of legislation,<br />
according to the established procedure.<br />
Standardization and regulation in the area of water resources use, protection and<br />
Restoration<br />
The following standards are established in the area of water resources use, protection, and<br />
restoration:<br />
standards of ecological safety of water usage:<br />
1. maximum allowable concentrations of substances in water bodies, water of which is<br />
used for satisfaction of drinking, communal and other needs of population;<br />
2. maximum allowable concentrations of substances in water bodies, water of which is<br />
used for fishery needs;<br />
3. permissible concentrations of radioactive substances in water bodies, water of which<br />
is used for satisfaction of drinking, communal and other needs of population.<br />
ecological standard of water quality in water bodies;<br />
standards of maximum allowable discharge of polluting substances;<br />
industrial technological standards of generation of substances that are discharged into<br />
water bodies;<br />
water usage technological standards;<br />
standards of maximum allowable discharge of polluting substances are established with<br />
the aim of stage-by-stage attaining the ecological standard of water quality for water<br />
bodies.<br />
Establishing, according to the Regulation on Development and Approval of Norms of<br />
Maximum Permissible Discharges of Pollutants, and an Inventory of Pollutants whose<br />
Discharge is Subject to Regulation Lists, of priority substances A, B, C.<br />
The state water monitoring is conducted with the aim of ensuring collection, processing,<br />
storage and analysis of the information on the condition of waters, prediction of its<br />
changes, and development of the recommendations for making scientifically substantiated<br />
decisions in the field of water usage and protection and water resources restoration.<br />
1.2. Expected Regional and Transboundary Effects of Actual and<br />
Planned Measures<br />
Of the identified in Chapter “Water Quality” hot spots and planned measures on reduction of<br />
transboundary impact the most important are the following:<br />
reconstruction and modernization of wastewater treatment facilities of Izmail cardboard factory<br />
that will result in reduction of adverse impact on the Black Sea coastal waters and fragile<br />
ecosystem of Danube delta;<br />
reconstruction of Uzhgorod wastewater treatment facilities for reduction of nitrogen, phosphorus,<br />
and easily oxidized organic matter (measured as BOD) load. At present the Uzhgorod wastewater<br />
treatment facilities (capacity 50 Th. m 3 per day) operates with 100 Th. m 3 /per day of municipal<br />
wastewater and discharge annually 13 mln. m 3 of insufficiently and untreated municipal