20.01.2014 Views

Technical Reports Parts C,D - ICPDR

Technical Reports Parts C,D - ICPDR

Technical Reports Parts C,D - ICPDR

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Technical</strong> <strong>Reports</strong> – Part D: Water Environmental Engineering 147<br />

Each cattle-breeding complex and big purposive farm must have in operation up-to-date sewage<br />

water networks and clean-up facilities. They must apply:<br />

<br />

<br />

<br />

complete biological sewage water treatment in accordance with a specified scheme;<br />

division of waste by liquid and solid fraction for further use of water for watering<br />

purposes and of solid sediments for fertilizing ones;<br />

composting of effluents with peat particles (crumbs) and with organic crop-growing<br />

waste in specific receptacles followed by the utilization of the obtained compost as a<br />

fertilizer.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!