Table 3.1. Summary of recommended projects for municipal hot spots<br />

Hot Spot Name,<br />

River and<br />

location<br />

(distance from<br />

mouth)<br />

Kolomyia<br />

WWTP, Prut,<br />

867 km<br />

Mukachevo<br />

WWPT,<br />

Latorytsia, 106<br />

km<br />

Parameters & Values which Define the Problem<br />

Insufficient Current Capacity of Municipal WWTP<br />

Versus to Real Wastewater Load, Capacity:56,3 TPE,<br />

Load: 71,3 TPE, Total BOD: 149,0 t. per year, COD-<br />

223,0 t per year, N-106,0 t per year, P-34,5 t per year<br />

Chemical and Biological treatment-Total discharge<br />

6.935 Th. m 3 per year<br />

Insufficient Current Capacity of Municipal WWTP<br />

Versus to Real Wastewater Load, Capacity: 122 TPE,<br />

Load: 86,6 TPE, Total BOD: 165,1 t. per year, COD<br />

206,4 t per year, N 95,1 t per year, P 48,9 t per year<br />

Chemical and Biological treatment<br />

Total discharge 8.424 Th. m 3 per year<br />

Ranking of<br />

the Problem<br />

Low<br />

priority<br />

Medium<br />

priority<br />

Name & Type<br />

of Project<br />

(Structural or<br />

Non-structural)<br />

Structural<br />

Project No 18,<br />

Structural<br />

Project No 14;<br />

Structural<br />

project No 15<br />

WWTP<br />

Structural<br />

project No 20;<br />

WWTP;<br />

SEWAGE;<br />

Uzhgorod<br />

WWTP, Uzh,<br />

33 km<br />

Insufficient Current Capacity of Municipal WWTP<br />

Versus to Real Wastewater Load Capacity:<br />

187,5TPE, Load: 297 TPE, Total BOD: 646 t. per<br />

year, COD 807,5 t per year, N 326,7 t per year, P<br />

130,1 t per year<br />

Chemical and Biological treatment<br />

Total discharge 28.908 Th. m 3 per year<br />

High<br />

priority<br />

Structural<br />

project No 5,<br />

WWTP<br />

Project Strategy &<br />

Targets<br />

Reconstruction of<br />

existing &<br />

Construction of new<br />

WWT facilities<br />

(secondary treatment)<br />

Reconstruction of<br />

existing &<br />

Construction of new<br />

WWT facilities<br />

(secondary treatment)<br />

upgrading sewage<br />

system<br />

Reconstruction of<br />

existing &<br />

Construction of new<br />

WWT facilities<br />

(secondary treatment)<br />

Parameters & Values<br />

which Define Project<br />

Benefits<br />

Final capacity will be<br />

increased to 168 TPE<br />

Final capacity will be<br />

increased to 165 TPE<br />

Final capacity will be<br />

increased to 281 TPE<br />

Project Beneficiaries<br />

Municipality of<br />

Kolomiya Town, Ivano-<br />

Frankivska oblast<br />

Municipality of<br />

Mukachevo Town,<br />

Improvement of<br />

transboundary situation,<br />

Zhakarpatska oblast<br />

Municipality of<br />

Uzhgorod Town,<br />

Improvement of<br />

transboundary situation,<br />

Zhakarpatska oblast