20.01.2014 Views

Technical Reports Parts C,D - ICPDR

Technical Reports Parts C,D - ICPDR

Technical Reports Parts C,D - ICPDR

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 3.3. Summary of recommended projects for industrial hot spots<br />

Hot Spot Name,<br />

River &<br />

Location<br />

(distance from<br />

mouth)<br />

Reconstruction<br />

of timber<br />

processing<br />

industry in<br />

upper Tizsa in<br />

Ukraine: a<br />

composite<br />

project<br />

Rakhiv<br />

Cardboard<br />

Factory, Tisza<br />

river<br />

Parameters & Values which Define the<br />

Problem<br />

Includes reconstruction of waste water<br />

treatment facilities of Velyky Bychkiv,<br />

Teresva timber processing plant and<br />

Rakhiv cardboard factory; consists of<br />

projects 3, 4, and 22<br />

Total BOD: 39 t/y, phenols no official<br />

discharge data, total discharge: 792.000<br />

m 3 /day<br />

Ranking of<br />

the Problem<br />

Name & Type<br />

of Project<br />

(Structural or<br />

Non –<br />

structural)<br />

medium Structural<br />

Project No<br />

consists of<br />

No3 No4, and<br />

22<br />

Medium<br />

priority<br />

Structural<br />

Project No 22<br />

Velikiy Bichkiv<br />

Timber<br />

processing<br />

Plant, Tizsa<br />

River<br />

Teresva Timber<br />

processing<br />

Plant, Tizsa<br />

river<br />

Outdated WWTP, pollution with<br />

phenols and chlorinated organic<br />

compounds.<br />

Total BOD: 23 t/y, Total discharge :<br />

839.900 m 3 /day, pollution with phenols<br />

and oil products<br />

Medium<br />

priority<br />

Medium<br />

priority<br />

Structural<br />

Project No 3<br />

Structural<br />

Project No4<br />

Izmail<br />

Cardboard Plant<br />

Insufficient input capacity of industrial<br />

WWTP with increased producing<br />

capacity.<br />

Low priority Structural<br />

Project<br />

No 11,<br />

WWTP<br />

Project Strategy & Targets<br />

feasibility study,<br />

reconstruction and<br />

construction of waste water<br />

treatment facilities,<br />

improvement of technological<br />

processes<br />

Reconstruction of existing &<br />

Construction of new WWT<br />

facilities and accumulation<br />

pounds, improvement of the<br />

technology processes<br />

Construction of new WWT<br />

facilities (secondary chemical<br />

treatment)<br />

Reconstruction of existing &<br />

Construction of new WWT<br />

facilities (secondary<br />

treatment)<br />

Reconstruction of existing<br />

WWT Improving of the<br />

existing technological process<br />

Parameters & Values<br />

which Define Project<br />

Benefits<br />

pollution reduction<br />

from timber<br />

processing industry in<br />

the Tizsa River basin<br />

in Ukraine<br />

Reduction of the<br />

Tissa river pollution<br />

with phenols, oil<br />

products and<br />

especially BOD<br />

organic.<br />

Developing<br />

recreational and sport<br />

fishing uses &<br />

Elimination of<br />

transboundary affect.<br />

Developing<br />

recreational use &<br />

Elimination of<br />

regional and possible<br />

transboundary affect<br />

Existing capacity will<br />

be use more rational<br />

Project Beneficiaries<br />

Rakhiv Cardboard Factory,<br />

Municipality of Rakhiv<br />

town & Zhakarpatska<br />

oblast<br />

Velikiy Bichkiv Timber<br />

processing Plant &<br />

Municipality of Velikiy<br />

Bichkiv town &<br />

Zhakarpatska oblast<br />

Improvement of regional<br />

and transboundary<br />

situation, Zhakarpatska<br />

oblast<br />

Municipality of Izmail<br />

Town, Improvement of<br />

transboundary affect on<br />

Black Sea Odesska oblast.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!