Technical Reports Parts C,D - ICPDR
Technical Reports Parts C,D - ICPDR
Technical Reports Parts C,D - ICPDR
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 2 continued<br />
No Type/name of Project or Programme<br />
20. Construction of the sewage<br />
system in the rural area of the<br />
region with total length 46,3<br />
km<br />
21. Automatically controlled<br />
information measuring<br />
system for flood forecasting<br />
and Tysa River water<br />
resources management - 2 nd<br />
stage (ACIM - Tysa).<br />
22. Complex utilization of timber<br />
with introduction of<br />
environmentally friendly<br />
technologies in Teresva<br />
Woodprocessing Enterprise.<br />
23. Complex utilization of timber<br />
with introduction of<br />
environmentally friendly<br />
technologies in<br />
Velykobychkiv Wood<br />
Chemistry Enterprise<br />
24. Construction of local area<br />
canalization networks in the<br />
villages of the region (the<br />
total length is 46.3 km<br />
Total Capital<br />
Requirements<br />
Funding<br />
Period<br />
(MNC) (MUS$)<br />
4,44 2,22 1998<br />
1999<br />
2000<br />
2001<br />
2002-<br />
2005<br />
1,8 - 1998<br />
1999<br />
2000<br />
10,0 5,0 1998-<br />
2000<br />
10,0 5,0 1998-<br />
2000<br />
4,44 2,22 1998-<br />
2005<br />
National Funding Sources International Funding<br />
Equity<br />
Envir.<br />
Fund<br />
Water<br />
Manag<br />
Fund<br />
Central<br />
Budget<br />
Public Loans Public Grants<br />
Reg.<br />
Budget<br />
Local<br />
Budget<br />
Central<br />
Budget<br />
Reg<br />
Budget<br />
Local<br />
Budget<br />
Comm.<br />
Bank<br />
Loans<br />
(MNC) (MNC) (MNC) (MNC) (MNC) (MNC) (MNC) (MNC) (MNC) (MNC) (MNC)<br />
Others Organis<br />
Grant Loan<br />
ation<br />
(MUS$) (MUS$)<br />
0,384<br />
0,672<br />
1,373<br />
2,016<br />
-<br />
0,384<br />
0,672<br />
1,373<br />
2,016<br />
Remarks