06.03.2014 Views

Traction Rolling Stock - Indian Railways Institute of Electrical ...

Traction Rolling Stock - Indian Railways Institute of Electrical ...

Traction Rolling Stock - Indian Railways Institute of Electrical ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8.5.2.14 Wherever time and facilities are available the passenger locomotives should<br />

immediately be washed.<br />

8.6 MONTHLY INSPECTION (IA)<br />

8.6.1 Tests<br />

The supervisor <strong>of</strong> E2 section should carry out tests listed below before and after the<br />

inspection .<br />

8.6.1.1 Preliminary tests with 25 kV supply ON –<br />

a) Measure and record battery (BA) voltage.<br />

b) Measure and record battery charger voltage.<br />

kg/ cm².<br />

c) Check time taken to build up compressed air pressure from 1 kg/cm² to 8-9<br />

d) Check blowing out <strong>of</strong> safety valve.<br />

e) Check vacuum obtained with driver brake control valve MPF or A9.<br />

f) After building up vacuum, check for vacuum leakage for 5 mins.<br />

g) Check vacuum drop required for brakes to apply.<br />

h) Note pressure gauge reading when brakes are applied.<br />

i) Check working <strong>of</strong> braking electro-valve VEF.<br />

j) Check working <strong>of</strong> blowers under 'direct' and 'automatic' starting conditions.<br />

k) Note and record air leakages for one minute in main reservoirs and brake<br />

cylinders.<br />

l) Test headlights.<br />

m) Test working <strong>of</strong> cab heaters and fans.<br />

8.6.1.2 Preliminary tests with 25 kV supply OFF -<br />

a) Measure and record time required for raising and lowering both the pantographs.<br />

b) Measure and record time taken for various time delay relays.<br />

c) Test functioning <strong>of</strong> auxiliary circuit earth fault relay (QOA) by creating an earth<br />

fault.<br />

d) Test functioning <strong>of</strong> power circuit earth fault (QOP) by creating an earth fault,<br />

e) Check functioning <strong>of</strong> all lights.<br />

8.6.1.3 Tests under high tension before and after inspection successively from cab 2 and

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!