8.11.4.12 Speedometers- Calibration by comparison with a standard meter.<br />
8.11.4.13 Meters and Gauges- Calibration with standard instruments.<br />
8.11.5 On completion <strong>of</strong> POH, the loco should be taken over by a representative, <strong>of</strong> the homing<br />
shed after a joint inspection at the workshop. Details <strong>of</strong> work done and modifications carried out<br />
should be entered in the History Book which should be returned along with the loco.<br />
8.11.6 Loco will be returned working on its own power and if possible working a train after POH<br />
to the owning Railway.<br />
8.12 REBUILDING AND RECABLING OF LOCOMOTIVES<br />
8.12.1 During every alternate POH, locomotives will need recabling and repiping <strong>of</strong> vacuum<br />
and pneumatic pipes. POH shops should, therefore, plan these works.<br />
8.12.2 During every 4th POH, mechanical components and traction gear may need rebuilding.<br />
Some <strong>of</strong> the major components will also need replacement. POH shops should plan for such<br />
works. Opportunity should be taken to upgrade the parts and use the state <strong>of</strong> art equipment during<br />
such extensive repairs.<br />
8.13 MECHANICAL SCHEDULES OF LOCO<br />
8.13.1 Loco wheel set: Record diameter and pr<strong>of</strong>ile <strong>of</strong> individual wheel. Wheel turning is<br />
required when the values are away from permissible limits given in Chapter 4 and below.<br />
Sr. Items to be Periodicity Permissible<br />
No. Inspected clearance tolerance<br />
01. Tyre pr<strong>of</strong>ile IA, IB, IC<br />
Root wear Y<br />
Flange wear X<br />
6 mm.<br />
3 mm.<br />
kmph.<br />
kmph.<br />
02. Flats on the running All 60 mm for speed < 100<br />
surfaces schedules 40 mm for speed > 100<br />
03. Proud metal at the edge - do - less than 6mm.<br />
8.13.2 Other mechanical items<br />
An important part <strong>of</strong> the maintenance <strong>of</strong> the locos is the checking at prescribed intervals<br />
<strong>of</strong> important mechanical clearance and dimensions which have a bearing on safe and efficient<br />
operation to ensure that they are within prescribed limits. Such measurements should be recorded<br />
suitably either in registers or on printed cards and preserved so as to be readily available for<br />
reference in the PPO at all times. The items to be checked at the interval at which these to be<br />
checked are indicated. Limits will be specified for each type <strong>of</strong> locomotives by the CEE based on<br />
the manufacturer’s/RDSO's recommendations.<br />
Sr. Items to be Periodicity <strong>of</strong>