06.03.2014 Views

Traction Rolling Stock - Indian Railways Institute of Electrical ...

Traction Rolling Stock - Indian Railways Institute of Electrical ...

Traction Rolling Stock - Indian Railways Institute of Electrical ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Notch 7<br />

T4, T8 and T9 closed, connecting transformer section M3-M7 in circuit with TL in series.<br />

Notch 8<br />

T4 and T7 closed, connecting section M3-M7.<br />

Notch 9<br />

T5, T7 and T9 closed, connecting transformer section M3-M8 in circuit with TL in series.<br />

Notch 10<br />

T5 and T8 closed. This connection applies the full voltage <strong>of</strong> the tapped half <strong>of</strong> the<br />

secondary winding M3-M8 to the rectifiers with DL still in series.<br />

Notch 11<br />

T6, T8 and T9 closed, connecting the section untapped half <strong>of</strong> the winding M1-M2 in<br />

circuit with TL in series but DL no longer in circuit.<br />

Notch 12<br />

T6 and T7 closed, connecting the untapped section <strong>of</strong> the winding M1-M2 the rectifier<br />

direct. This is the HALF POWER connection, and movement <strong>of</strong> the master controller handle to<br />

position 2 (half power) will allow notching to proceed automatically upto this notch.<br />

Notch 13<br />

Before proceeding to notch 13, movement <strong>of</strong> the master controller handle beyond<br />

position 2 causes the winding grouping switch to throw from LV to the HV position. This causes<br />

contacts W1 to open and W2 to close. Transition to notch 13 is completed when T1 closes and T6<br />

opens after which T9 closes connecting the untapped winding plus one section <strong>of</strong> the tapped<br />

winding M1-M4 in circuit.<br />

Notch 14<br />

T1 and T8 closed, connecting sections M1-M4 direct.<br />

Notch 15<br />

T2, T8, and T9 closed, connecting the untapped winding plus two sections <strong>of</strong> the tapped<br />

winding M1-M5 in circuit with TL in series.<br />

Notch 16<br />

T2 and T7 closed, connecting sections M1-M5 direct.<br />

Notch 17<br />

T3 T7 and T9 closed, connecting the untapped winding plus three sections <strong>of</strong> the tapped<br />

winding M1-M6 in circuit with TL in series.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!