Traction Rolling Stock - Indian Railways Institute of Electrical ...
Traction Rolling Stock - Indian Railways Institute of Electrical ...
Traction Rolling Stock - Indian Railways Institute of Electrical ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Notch 7<br />
T4, T8 and T9 closed, connecting transformer section M3-M7 in circuit with TL in series.<br />
Notch 8<br />
T4 and T7 closed, connecting section M3-M7.<br />
Notch 9<br />
T5, T7 and T9 closed, connecting transformer section M3-M8 in circuit with TL in series.<br />
Notch 10<br />
T5 and T8 closed. This connection applies the full voltage <strong>of</strong> the tapped half <strong>of</strong> the<br />
secondary winding M3-M8 to the rectifiers with DL still in series.<br />
Notch 11<br />
T6, T8 and T9 closed, connecting the section untapped half <strong>of</strong> the winding M1-M2 in<br />
circuit with TL in series but DL no longer in circuit.<br />
Notch 12<br />
T6 and T7 closed, connecting the untapped section <strong>of</strong> the winding M1-M2 the rectifier<br />
direct. This is the HALF POWER connection, and movement <strong>of</strong> the master controller handle to<br />
position 2 (half power) will allow notching to proceed automatically upto this notch.<br />
Notch 13<br />
Before proceeding to notch 13, movement <strong>of</strong> the master controller handle beyond<br />
position 2 causes the winding grouping switch to throw from LV to the HV position. This causes<br />
contacts W1 to open and W2 to close. Transition to notch 13 is completed when T1 closes and T6<br />
opens after which T9 closes connecting the untapped winding plus one section <strong>of</strong> the tapped<br />
winding M1-M4 in circuit.<br />
Notch 14<br />
T1 and T8 closed, connecting sections M1-M4 direct.<br />
Notch 15<br />
T2, T8, and T9 closed, connecting the untapped winding plus two sections <strong>of</strong> the tapped<br />
winding M1-M5 in circuit with TL in series.<br />
Notch 16<br />
T2 and T7 closed, connecting sections M1-M5 direct.<br />
Notch 17<br />
T3 T7 and T9 closed, connecting the untapped winding plus three sections <strong>of</strong> the tapped<br />
winding M1-M6 in circuit with TL in series.