06.03.2014 Views

Traction Rolling Stock - Indian Railways Institute of Electrical ...

Traction Rolling Stock - Indian Railways Institute of Electrical ...

Traction Rolling Stock - Indian Railways Institute of Electrical ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

) Check capacitor <strong>of</strong> headlight stabilizer,<br />

c) Check transformer and tap changer oil for di-electric strength and acidity.<br />

Recondition/ replace, if necessary.<br />

d) Check the switch angle <strong>of</strong> SMGR.<br />

e) Overhaul SMGR.<br />

f) Lubricate all electro-pneumatic contactors.<br />

g) Check Q factor <strong>of</strong> electro-pneumatic contactors.<br />

h) Inspect dynamic braking resistor for damage. Overhaul and record resistance.<br />

Section E3<br />

Carry out the following:<br />

a) Lubricate Arno bearings, measure and record insulation resistance values.<br />

b) Overhaul brush holder insulators.<br />

c) Overhaul auxiliary machines.<br />

Section E4<br />

a) Overhaul and calibrate main power circuit overload relay (QLM), silicon rectifier<br />

overload relay (QRSI), electric braking overload relay (QF), braking excitation<br />

overload relay (QE), power circuit earth fault relay (QOP), auxiliary circuit earth<br />

fault relay (QOA) and No-volt relay (Q30).<br />

b) Overhaul and test Q118, Q44, QTD and Q 48.<br />

c) Overhaul and test SMGR relays (Q51, Q52), QD and Q20.<br />

d) Overhaul speedometer.<br />

8.10 INTERMEDIATE OVERHAUL (IOH)<br />

8.10.1. IOH <strong>of</strong> locos may be done at the homing shed itself or at a workshop nominated for the<br />

purpose.<br />

8.10.2. During IOH, in addition to a thorough inspection <strong>of</strong> all mechanical and electrical items as<br />

detailed under IA, IB, IC and AOH, squaring <strong>of</strong> bogies should be done and traction motors,<br />

rectifiers, auxiliary machines, blowers, tap changer, pantograph etc. should be taken <strong>of</strong>f the loco<br />

and overhauled. Transformer oil should be filtered and replaced if acidity is beyond the permissible<br />

limits. All wheels should be re-pr<strong>of</strong>iled. Insulation resistance <strong>of</strong> all HT and LT circuits should, be<br />

measured and recorded. Approved modifications, which can be executed in the shed, should be<br />

carried out.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!