to eliminate the possibility <strong>of</strong> fires due to short circuits/overloads etc. Always ensure that the<br />

proper sizes and types fuses are used for replacement. Check calibration <strong>of</strong> MCBs and fuses <strong>of</strong><br />

only approved suppliers as laid down by RDSO.<br />

9.2.5 Ensure that all the protective relays are in good working order and are properly<br />

calibrated.<br />

9.2.6 A loose connection is a potential source <strong>of</strong> fire. Proper tightness <strong>of</strong> all the connections<br />

is, therefore, to be ensured and this point is to be given particular attention during inspections.<br />

Locos commissioned after POH or new locos after commissioning should be thoroughly checked<br />

up for loose connection, as during the first few days, loose connections will show up. Ensure that<br />

the connections secured with a nut and bolts are provided with a set <strong>of</strong> plain and spring washers.<br />

9.2.7 Insulation failures can result from surface flash over due to presence <strong>of</strong> dirt and dust. It<br />

is, therefore, essential that proper cleaning <strong>of</strong> terminal connections, bus bars, insulations and<br />

equipment is done during schedules as laid down to remove oil and dust.<br />

9.2.8 Fires in control equipment cubicles are a problem and usually lead to considerable<br />

damage. Segregation <strong>of</strong> phases in TK panel, provision <strong>of</strong> insulating separators between the<br />

phases, use <strong>of</strong> Epoxy or Nylon cleats should be done.<br />

9.2.9 Batteries constitute some fire or explosion risk when they are being given a heavy<br />

charge. Heavy charging can be higher due to malfunction <strong>of</strong> the charging equipment or<br />

carelessness when charging from the shop floor rectifier. It is therefore important to check that the<br />

ventilation provided in the battery box is not choked.<br />

9.2.10 Use only elastomeric cable as per RDSO specification No.E-14/01 Part I and II<br />

revision1<strong>of</strong> 1992 should be used. Cleats used should not have sharp corners. Power, auxiliary and<br />

control cables should be separately laid down to prevent the chances <strong>of</strong> short circuit <strong>of</strong> cables <strong>of</strong><br />

different voltage grade.<br />

9.2.11 In order to monitor healthy condition <strong>of</strong> insulation <strong>of</strong> wiring and equipment, insulation<br />

resistance should be measured periodically in sheds and during POH in shops, and records kept.<br />

9.2.12 In the event <strong>of</strong> fire it is essential that the main circuit breaker is tripped and the battery<br />

fuses <strong>of</strong> locomotives and EMUs are immediately removed to eliminate the continued feeding <strong>of</strong> the<br />

fault by the battery.<br />

9.3 TECHNICAL INVESTIGATION INTO FIRES<br />

Every case <strong>of</strong> fire minor or major, irrespective <strong>of</strong> the location, whether in power, auxiliary<br />

or control circuits, should be investigated very carefully, every though an inquiry in accordance<br />

with the Accident Rules may not be called for. The cause as established by the investigation<br />

should be analyzed by the Sr.DEE/DEE personally to identify areas requiring further investigation<br />

and to tighten up preventive measures. A report on each case <strong>of</strong> fire should also be furnished to<br />

CEE. The general guidelines to check up the items in locomotive in the event <strong>of</strong> fire, is given<br />

below:<br />

9.3.1 Items to be cheeked up after the fire in a Locomotive:<br />

Position <strong>of</strong> master controller SMGR drum and tap position <strong>of</strong> tap changer.<br />

Condition <strong>of</strong> DJ, whether locked or open<br />

Whether relays particularly QLM, QRSI, QOP, QOA are in tripped condition or normal.