- Page 2 and 3: PREFACE The book on "Traction Rolli
- Page 6 and 7: Fig.1.1.3
- Page 8 and 9: Leg I A I = 704 cm 2 (Regulating tr
- Page 10 and 11: Voltage Primary output : Primary ma
- Page 12 and 13: y the main shaft through gear arran
- Page 14 and 15: Base load … 500 ohms,300W (12nos.
- Page 16 and 17: 1.4.6 Over-voltage Over -voltage in
- Page 18 and 19: 2.3 BOGIE COMPONENTS Bogie of a loc
- Page 20 and 21: Fig. 2.5. Primary and secondary sus
- Page 23: 2.8 BOGIE OF WAG/7 This is a 3 axle
- Page 26 and 27: Fig. 1. Single Reduction Gear Drive
- Page 31 and 32: FIG.3.6 ROTOR HOLLOW SHAFT DRIVE
- Page 34 and 35: 5. POWER CONTROL AND AUXILIARY CIRC
- Page 36 and 37: Permanent field weakening resistanc
- Page 38 and 39: 5.4.1 Arno converter (CVAR) The sin
- Page 40 and 41: pantographs 1 and 2 are lowered. Po
- Page 42 and 43: the tap changer comes to a standsti
- Page 44 and 45: d) The tap changer GR must be at po
- Page 46 and 47: 5.7.3.1 Control of transformer tap
- Page 48 and 49: VE2. The limit contacts of 61-62 fo
- Page 50 and 51: With multiple unit operation the ma
- Page 52 and 53: elay Q48. If the wheels on one bogi
- Page 54 and 55:
5.9.1.4 Lamp LSGR (Green) Tap chang
- Page 56 and 57:
cabs are controlled by means of the
- Page 73 and 74:
6. AIR COMPRESSOR 6.0 INTRODUCTION
- Page 75 and 76:
6.3 COMPRESSOR DETAILS Model : TRC
- Page 77 and 78:
1) Type & Make : 1) Northey Type 25
- Page 79 and 80:
one shaft to the other, and maintai
- Page 81 and 82:
7. BRAKE SYSTEM OF ELECTRIC LOCOMOT
- Page 83 and 84:
y the driver’s vacuum brake valve
- Page 87 and 88:
7.2 DUAL BRAKE SYSTEM ON ELECTRIC L
- Page 89 and 90:
is run to maintain vacuum in the sy
- Page 91 and 92:
1. MR equalising pipe 2. BC equalis
- Page 97 and 98:
7.2.11 Gauges There are five gauges
- Page 99 and 100:
akes. e) When Driver makes an emerg
- Page 101 and 102:
train. Failure of the orange lamps
- Page 104 and 105:
8. MAINTENANCE, AND OVERHAUL SCHEDU
- Page 106 and 107:
e made to increase the interval bet
- Page 108 and 109:
8.5.2.6 Battery: Check and record b
- Page 110 and 111:
cab 1 a) Raising of pantograph. b)
- Page 112 and 113:
d) Check containers of batteries fo
- Page 114 and 115:
Section E4 Carry out following: a)
- Page 116 and 117:
f) Inspect all resistance, includin
- Page 118 and 119:
) Check capacitor of headlight stab
- Page 120 and 121:
8.11.4.12 Speedometers- Calibration
- Page 122 and 123:
8.15.3 One copy of the certificate
- Page 124 and 125:
to eliminate the possibility of fir
- Page 126 and 127:
invariably be a member of the inqui
- Page 128 and 129:
Two capacitors of 0.05 microfarads
- Page 130 and 131:
Notch 18 T3 and T8 closed, connecti
- Page 132 and 133:
These machines are capacitor start
- Page 134:
The main lighting circuits are fed