The opening <strong>of</strong> the HBA switched causes the relay QV-62 to drop out. The lamp LSGR is<br />

extinguished.<br />

5.7.3.3 OPERATION AT POSITION (+) OR (-) WITH RUNNING OR BRAKING IN MULTIPLE -<br />

UNIT OPERATION<br />

When (+) or (-) command is given with the master controller MP the notch to notch relay<br />

Q52 is energized in all locomotives. The auxiliary contacts <strong>of</strong> this relay in the run <strong>of</strong> the line 080-<br />

081 prevent the synchronous running supervisory relay Q49 from being energized.<br />

If one <strong>of</strong> the air motors, does not follow the order, the relay Q49 on this faulty locomotive<br />

remains energized. The relay Q52 is held on the healthy locomotives too via the control coupler<br />

via the line run 211-085, thereby preventing further movement <strong>of</strong> the tap changer air motors.<br />

5.7.4.4 EMERGENCY STOP (ZERO POSITION OF MASTER CONTROLLER) WITH<br />

MULTIPLE UNIT OPERATION<br />

In this case the synchronous running supervisory control is cut out <strong>of</strong> action, since the<br />

zero position should be reached without interruption. The holding circuit - 87 for Q52 is interrupted<br />

by auxiliary contacts <strong>of</strong> Q46.<br />

Nevertheless, the relays Q49 and Q52 operate during the transition from notch to notch,<br />

since the energized relay Q46 itself switches on Q52 which, in turn, again switches <strong>of</strong>f Q49.<br />

However, the result <strong>of</strong> closing the Q46 auxiliary contact in the line run 087 (holding<br />

circuit) <strong>of</strong> the relay Q52 will be that, should an air motor stop before reaching the zero position,<br />

the main circuit breaker DJ will be tripped after approx.5.5sec. via Q46/Q118. The tripping<br />

<strong>of</strong> main circuit breakers on healthy locomotives will, however, be avoided.<br />

Since the return to zero during regression is not synchronized, it is necessary to avoid<br />

that the relay Q49 holds the remaining air motors via the multiple unit control lines as soon as the<br />

first tap changer <strong>of</strong> the coupled locomotives reached the zero position.<br />

For this purpose the contact <strong>of</strong> the auxiliary relay QV62 is inserted in the feed line <strong>of</strong><br />

Q49. When the particular tap changer reaches zero the relay QV62 picks up and interrupts the<br />

energizing circuit <strong>of</strong> Q49.<br />

5.7.5.5 ELECTRICAL AUXILIARY CONTROL OF TAP CHANGER<br />

In the case <strong>of</strong> faults affecting the issue <strong>of</strong> orders by the master controller, emergency<br />

electrical control (EEC) may be maintained with the aid <strong>of</strong> push buttons for notching up BPP and<br />

for notching down BPR.<br />

The following conditions must be satisfied for such operation:<br />

a) Switching on <strong>of</strong> lever in switch box (BL) provided in drivers cab.<br />

b) The master controller hand wheel must be at position "0" or "N".<br />

c) The programme switch ZSMS on the pneumatic control panel is changed over to<br />

position "0". A possible infeed via the master controller contacts is thus prevented<br />

while the lines 065 and 066 are energized.<br />

The push buttons BPP or BPR then act directly on the solenoid valves SMGR-VE1 and