06.03.2014 Views

Traction Rolling Stock - Indian Railways Institute of Electrical ...

Traction Rolling Stock - Indian Railways Institute of Electrical ...

Traction Rolling Stock - Indian Railways Institute of Electrical ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

C3W distributor valve causes output air pressure to be sent to control port 2 <strong>of</strong> C2 relay valve<br />

through F-l selector valve in loco and in the trailing stock. This causes C2 relay valve <strong>of</strong> loco<br />

and C3W distributor valve <strong>of</strong> trailing stock to allow compressed air at same pressure to brake<br />

cylinder and proportionate application <strong>of</strong> brakes in both loco and trailing stock takes place.<br />

Simultaneously port 10 H5 relay air valve senses the reduction in BP pressure. This<br />

valve actuates, closes exhaust port 13 and connects port 9 to port 11. Main reservoir pressure<br />

from port 9 through port 11 and double check valve (A33) operates the pressure switch (RGEB,<br />

B15) to cause auto regression in the control circuit <strong>of</strong> the locomotives.<br />

7.2.10.3 Train parting with vacuum brake stock (Ref. fig. 7.2.4)<br />

When train equipped with vacuum brake gets parted the proportionate application <strong>of</strong> air<br />

brake in the loco and vacuum brake in the stock shall take place. During train parting as the<br />

vacuum in the train pipe falls by 10 to 15 cms it is sensed by VA-1B valve whose port 2 and 6 is<br />

having vacuum train pipe as its signal. The VA-1B valve get actuated and the exhauster is<br />

disconnected from vacuum train pipe also ports 1 and 11 <strong>of</strong> this valve gets connected. Main<br />

reservoir pressure passes to port 1 after getting reduced to 1.4 to 1.7 kg/cm² by control air valve<br />

HS4. This reduced pressure passes to port 10 <strong>of</strong> HB5 pipe relay valve. On receipt <strong>of</strong> this control<br />

pressure, HB5 gets actuated and port 9 (exhaust port) gets closed and port 12 and 11 gets<br />

connected. MR pressure through port 12 passes to double check valve (A33) through port 11 <strong>of</strong><br />

HB5 relay valve to pressure actuated switch (RGEB, B15) to start the auto regression control<br />

circuit in the loco.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!