24.03.2014 Views

Service Manual, General Motors 4.3L Engine (TP ... - Kohler Power

Service Manual, General Motors 4.3L Engine (TP ... - Kohler Power

Service Manual, General Motors 4.3L Engine (TP ... - Kohler Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6-138 Marine/Industrial <strong>4.3L</strong> <strong>Engine</strong><br />

6. Remove the J 5239.<br />

31373<br />

Notice: Refer to Fastener Notice in Cautions and Notices.<br />

7. Install the connecting rod caps, bearings and nuts.<br />

Tighten<br />

7.1. Tighten the nuts evenly on the first pass to 27 N•m (20<br />

lb ft).<br />

7.2. Use the J 36660 in order to tighten the nuts on the final<br />

pass an additional 70 degrees.<br />

480549<br />

8. After the piston and connecting rod assemblies have been<br />

installed, then lightly tap each connecting rod assembly<br />

(parallel to the crankpin) in order to ensure that the<br />

connecting rods have side clearance.<br />

9. Use a feeler gauge or a dial indicator to measure the<br />

connecting rod side clearance between the connecting rod<br />

caps. The connecting rod side clearance should be 0.15-<br />

0.44 mm (0.006-0.017 in).<br />

2000 Marine/Industrial<br />

5163

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!