Last Amended: 15 January 2007 Council Plan 2006 Appendix A<br />

Ref No. Key Objective Task<br />

(Short Term Target)<br />

Corporate<br />

Director to<br />

end Sept<br />

Lead<br />

Officer<br />

Key Actions Sub Key Actions Target<br />

Dates<br />

Key Actions<br />

Completed<br />

Progress Comment<br />

13 A safe borough Introduce ten more<br />

pedestrian crossings in<br />

the borough.<br />

PB JaW 1) Draw up list <strong>of</strong> crossings for<br />

inclusion.<br />

2) Report schemes to<br />

Cabinet Member for<br />

agreement.<br />

3) Complete installation<br />

1) 7/06<br />

2) 9/06<br />

3) 3/07<br />

1) Yes 1/07 update - Crossings<br />

already completed on site<br />

include - 1) Victoria Road<br />

(near Civic Way) 2) High<br />

Street/Vine Street (Uxbridge).<br />

3) <strong>Hillingdon</strong> Road/Kingston<br />

Lane. 4) Victoria Road near<br />

Sidmouth Drive. 5) West End<br />

Road near Sidmouth Drive.<br />

Others have already been<br />

commissioned for design and<br />

implementation, for completion<br />

by end 3/07, including - 6)<br />

Swakeleys Road (as part <strong>of</strong><br />

School Travel Plan) - due on<br />

site 2/07. 7) High Street<br />

Ruislip (as a local safety<br />

scheme) being implemented<br />

as part <strong>of</strong> other ongoing works<br />

at this site. 8) Tavistock<br />

Road, West Drayton - due on<br />

site 1/07 as a road safety<br />

programme scheme. 9)<br />

Watford Road, Northwood -<br />

substantially completed as <strong>of</strong><br />

1/07. 10) Ladygate Lane,<br />

Ruislip - due on site 1/07.<br />

Other sites have been<br />

identified for potential further<br />

study and possible<br />

implementation in 2007/08<br />

14 A safe borough Ensure that 99.5% <strong>of</strong> all<br />

street lighting is<br />

working as planned.<br />

PB TE Undertake regular night<br />

inspections, respond promptly<br />

to defects reported. Local PI<br />

for 2005/06 = 99.66%.<br />

National PI (average time to<br />

repair defect) = 1.42 days.<br />

1) Monitor with local and national PI's. 1) Monthly<br />

2) Implementation <strong>of</strong> new EXOR highway 2) 3/07<br />

management s<strong>of</strong>tware system.<br />

1/07 update -<br />

1) On target for first 8<br />

months at 99.61%.<br />

2) EXOR implementation -<br />

on track<br />

ITEM 06 council plan appendices.xls<br />

Green - Completed/On Track<br />

Amber - Some Slippage<br />

Red - Serious Slippage 8