27.07.2014 Views

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Last Amended 15 January 2007<br />

Community Strategy - Council Lead<br />

Appendix B<br />

35<br />

38<br />

39<br />

40<br />

41<br />

42<br />

A safe borough<br />

A clean and<br />

attractive borough<br />

A clean and<br />

attractive borough<br />

A clean and<br />

attractive borough<br />

A clean and<br />

attractive borough<br />

A clean and<br />

attractive borough<br />

Extend safer routes to school<br />

from 30 to 45.<br />

Maintain green flag awards at<br />

the 3 sites awarded this<br />

standard in 2005. Review the<br />

provision <strong>of</strong> the service for dog<br />

fouling bins across the borough.<br />

Install new bins and improve<br />

specification for emptying as<br />

required in line with residents’<br />

needs.<br />

Nine site-specific anti-dog<br />

fouling campaigns run to<br />

reinforce the message with<br />

community support.<br />

Introduce enforcement,<br />

education and preventative<br />

strategies in schools to deal with<br />

graffiti.<br />

Implement targets for delivering<br />

greater use <strong>of</strong> open space for<br />

recreation, conservation and<br />

food growth once agreed in<br />

March 2006.<br />

Hold four allotment taster<br />

sessions – two at Highgrove and<br />

two at Hayes. Hold one five<br />

week course.<br />

JP JR Revised target for 06/07 is 55<br />

schools (57% <strong>of</strong> total).<br />

PB MW/CR 1) Green Flags - retain the<br />

awards during annual judging,<br />

try for further awards.<br />

2) Dog fouling - Waste services<br />

have an ongoing programme <strong>of</strong><br />

installing bins on public<br />

walkways and parks as need is<br />

identified by the public or <strong>of</strong><br />

PB MW Sites include - Barra Hall Park,<br />

Fassnidge Park, Churchfield<br />

Gardens, Yiewsley Recreation<br />

Ground, Ruislip Lido, Ruislip<br />

Woods, Minet Country Park,<br />

Rockingham Recreation Ground<br />

and Bourne Farm Open Space.<br />

PB KS 1) Carry out "Art for Sale"<br />

project with Police, Youth<br />

Services and Community safety<br />

2) Organise and carry out<br />

campaigns in schools<br />

1/07 - Parks already covered<br />

include - Minet Country Park,<br />

Yiewsley Rec, Cowley Rec,<br />

FassnidgePark, <strong>Hillingdon</strong> House<br />

Farm, Churchfield Gdns, Barra Hall<br />

Park, The Fairway, Ruislip Lido, and<br />

Pole Hill Open Space.<br />

PB MW 1) Carry out survey <strong>of</strong> Parks<br />

and Countryside sites to<br />

establish targets.<br />

2) Implement actions to achieve<br />

those targets.<br />

1) Survey being carried out between<br />

21st and 29th October<br />

PB MW Arrange sessions and taster<br />

course<br />

01-Mar<br />

1) 8/06<br />

2) Ongoing<br />

1/07 update - On track with<br />

20 schools producing<br />

Travel Plans by 3/07<br />

making a total <strong>of</strong> 54.<br />

1) Yes 1/07 update - 1) 3 Green<br />

Flags retained plus 2 new<br />

green flags awarded.<br />

2) Ongoing - 22 new bins<br />

being installed 10/1/07<br />

Green -<br />

On Track<br />

Green -<br />

On Track<br />

30-Nov Yes Anti dog fouling campaigns Green -<br />

have now been carried out Completed<br />

at 10 parks by Parks Patrol.<br />

More walkers are beginning<br />

to use the bags for waste<br />

and Bourne Farm will also<br />

be included in the final<br />

quarter.<br />

1) 1)Yes<br />

30/9/2006 2) Yes<br />

2) 31/11/06<br />

1/07 update - 1) Project Green -<br />

commenced in Brookside Completed<br />

Youth Centre in 9/06.<br />

2) Assemblies in schools on<br />

graffiti have been carried<br />

out as part <strong>of</strong> the Safer<br />

Estates Programme from<br />

November 06<br />

01-Sep Yes Survey was carried out<br />

between 21st and 29th<br />

October, results analysed<br />

and follow up actions being<br />

implemented impacting on<br />

public's enjoyment <strong>of</strong> open<br />

spaces<br />

1) 9/06<br />

2) 3/07<br />

Green -<br />

Completed<br />

1) Yes Four taster sessions were Green -<br />

2) On track held, five week course was completed<br />

arranged but cancelled due<br />

to lack <strong>of</strong> take up.<br />

ITEM 06 council plan appendices.xls 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!