27.07.2014 Views

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Achievements Quarter 3<br />

Appendix C<br />

Achievement<br />

Council<br />

Plan<br />

Community<br />

Strategy<br />

Contributing to<br />

Improving<br />

CPA score<br />

PSA HIP Good News<br />

Major Construction Projects<br />

Botwell Green Community Sports and Leisure Centre planning<br />

application submitted and funding will be obtained as a result <strong>of</strong><br />

the successful disposal <strong>of</strong> Hayes Stadium.<br />

Received agreements in principle to part fund the 50m pool at<br />

<strong>Hillingdon</strong> House Farm (F&R).<br />

Libraries – satisfaction survey results –<br />

The overall satisfaction ratings with the library service (BV118c<br />

“very good” and “good”) was 91.1%. Although this figure is slightly<br />

lower than in 2003 (when it was 92.8%), this time a higher<br />

percentage ticked the ”very good” box (44.3% compared to<br />

37.4%).<br />

The results for the BV indicators mean that our CPA rating will not<br />

be affected.<br />

BV 118a - Percentage <strong>of</strong> people who found a book to borrow =<br />

86.5%. This compares to 63.1% in 2003<br />

BV 118b – Percentage <strong>of</strong> people who found the information they<br />

were looking for = 74.3%. This compares to 69.9% in 2003 (PCS).<br />

Highgrove Pool<br />

Highgrove Pool received an award as a 'Top Performer' in Sport<br />

England's National Benchmarking Service. The award was for<br />

excellent results in attracting use by target groups including<br />

people on low income, special needs and ethnic minorities from<br />

the local population. Highgrove, along with Hayes Pool and<br />

Queensmead Sports Centre also showed a significant increase in<br />

overall satisfaction which on average increased from 66.7% to<br />

86.5%. (PCS)<br />

Centre <strong>of</strong> Excellence for Teacher Training<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

ITEM 06 council plan appendices.xls 52

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!