Supplementary A - London Borough of Hillingdon
Supplementary A - London Borough of Hillingdon
Supplementary A - London Borough of Hillingdon
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Last Amended 15 January 2007<br />
Community Strategy - Council Lead<br />
Appendix B<br />
48<br />
50<br />
51<br />
53<br />
A clean and<br />
attractive borough<br />
A clean and<br />
attractive borough<br />
A clean and<br />
attractive borough<br />
A clean and<br />
attractive borough<br />
Review and redraft <strong>Hillingdon</strong>’s<br />
waste strategy in line with<br />
regional strategy and improve<br />
website information provided<br />
Increase the overall recycling<br />
and composting rate in the<br />
borough to 30.5%.<br />
Submit the Local Development<br />
Framework with Sustainability<br />
Appraisal to the Government<br />
Office for <strong>London</strong> and to seek to<br />
adopt it for development control<br />
purposes.<br />
Take forward the planning<br />
enforcement action plan and<br />
protocols published in 2005/06.<br />
PB CR West <strong>London</strong> Waste Strategy is<br />
already in place - our own<br />
internal strategy draft will be in<br />
place by 3/07 - will then require<br />
public consultation and Cabinet<br />
approval - should be complete<br />
by 7/07.<br />
PB CR Monthly monitoring to ensure<br />
that targets are achieved<br />
JP JR 1) Submission to the Secretary<br />
<strong>of</strong> State.<br />
2) Public consultation<br />
3) Examination in public.<br />
4) Adoption<br />
JP SB 1) Enforcement processes<br />
being e-enabled as part <strong>of</strong> the<br />
Action Plan<br />
Update - Revised Core Strategy<br />
Preferred Options to Cabinet<br />
30/11/06 for consultation.<br />
Consultation between 12/06 and<br />
1/07.<br />
Formal submission approval to Full<br />
Council 3/07<br />
3/07 - draft<br />
7/07<br />
approval<br />
Monthly<br />
monitoring<br />
1) now 3/07<br />
2) now 4/07<br />
3) Awaiting<br />
date for<br />
Planning<br />
Inspectorat<br />
e<br />
4) To follow<br />
on from 3<br />
above<br />
1/07 Update - Work now Green - On<br />
moving forward via Track<br />
RESPOC so there could be<br />
a slight delay to the final<br />
timetable to take account <strong>of</strong><br />
their recommendations in<br />
April 07.<br />
1/07 update - With the Green - On<br />
introduction <strong>of</strong> glass Track<br />
recycling in 12/06 pr<strong>of</strong>iling<br />
shows that we are currently<br />
on track to achieve this<br />
target. Recent results have<br />
been very encouraging. We<br />
are also monitoring the<br />
effects <strong>of</strong> the dry summer<br />
on the overall collection <strong>of</strong><br />
green waste.<br />
1/07 update - now on track -<br />
A revised timetable for the<br />
Local Development<br />
Framework (LDF) was<br />
agreed by Cabinet on<br />
19/10/06 with target dates<br />
redrawn following Cabinet<br />
consideration. Now working<br />
to a new timetable following<br />
advice from DCLG. The<br />
timetable for formal<br />
submission now revised to<br />
take account <strong>of</strong> additional<br />
scrutiny by the DCLG and<br />
Regional Offices <strong>of</strong> LDF<br />
documents for all Local<br />
Authorities in England.<br />
1) 10/06 1/07 update - Completed -<br />
protocols are on the<br />
website and Ocella<br />
database is operational.<br />
Green -<br />
On Track<br />
Green -<br />
Completed<br />
ITEM 06 council plan appendices.xls 31