27.07.2014 Views

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Last Amended 15 January 2007<br />

Community Strategy - Council Lead<br />

Appendix B<br />

48<br />

50<br />

51<br />

53<br />

A clean and<br />

attractive borough<br />

A clean and<br />

attractive borough<br />

A clean and<br />

attractive borough<br />

A clean and<br />

attractive borough<br />

Review and redraft <strong>Hillingdon</strong>’s<br />

waste strategy in line with<br />

regional strategy and improve<br />

website information provided<br />

Increase the overall recycling<br />

and composting rate in the<br />

borough to 30.5%.<br />

Submit the Local Development<br />

Framework with Sustainability<br />

Appraisal to the Government<br />

Office for <strong>London</strong> and to seek to<br />

adopt it for development control<br />

purposes.<br />

Take forward the planning<br />

enforcement action plan and<br />

protocols published in 2005/06.<br />

PB CR West <strong>London</strong> Waste Strategy is<br />

already in place - our own<br />

internal strategy draft will be in<br />

place by 3/07 - will then require<br />

public consultation and Cabinet<br />

approval - should be complete<br />

by 7/07.<br />

PB CR Monthly monitoring to ensure<br />

that targets are achieved<br />

JP JR 1) Submission to the Secretary<br />

<strong>of</strong> State.<br />

2) Public consultation<br />

3) Examination in public.<br />

4) Adoption<br />

JP SB 1) Enforcement processes<br />

being e-enabled as part <strong>of</strong> the<br />

Action Plan<br />

Update - Revised Core Strategy<br />

Preferred Options to Cabinet<br />

30/11/06 for consultation.<br />

Consultation between 12/06 and<br />

1/07.<br />

Formal submission approval to Full<br />

Council 3/07<br />

3/07 - draft<br />

7/07<br />

approval<br />

Monthly<br />

monitoring<br />

1) now 3/07<br />

2) now 4/07<br />

3) Awaiting<br />

date for<br />

Planning<br />

Inspectorat<br />

e<br />

4) To follow<br />

on from 3<br />

above<br />

1/07 Update - Work now Green - On<br />

moving forward via Track<br />

RESPOC so there could be<br />

a slight delay to the final<br />

timetable to take account <strong>of</strong><br />

their recommendations in<br />

April 07.<br />

1/07 update - With the Green - On<br />

introduction <strong>of</strong> glass Track<br />

recycling in 12/06 pr<strong>of</strong>iling<br />

shows that we are currently<br />

on track to achieve this<br />

target. Recent results have<br />

been very encouraging. We<br />

are also monitoring the<br />

effects <strong>of</strong> the dry summer<br />

on the overall collection <strong>of</strong><br />

green waste.<br />

1/07 update - now on track -<br />

A revised timetable for the<br />

Local Development<br />

Framework (LDF) was<br />

agreed by Cabinet on<br />

19/10/06 with target dates<br />

redrawn following Cabinet<br />

consideration. Now working<br />

to a new timetable following<br />

advice from DCLG. The<br />

timetable for formal<br />

submission now revised to<br />

take account <strong>of</strong> additional<br />

scrutiny by the DCLG and<br />

Regional Offices <strong>of</strong> LDF<br />

documents for all Local<br />

Authorities in England.<br />

1) 10/06 1/07 update - Completed -<br />

protocols are on the<br />

website and Ocella<br />

database is operational.<br />

Green -<br />

On Track<br />

Green -<br />

Completed<br />

ITEM 06 council plan appendices.xls 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!