12.09.2014 Views

o_191ln0gpf9pgfdj4601afj5gva.pdf

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

13. Platforms and Ladders Required to Service Other Requirements _____________<br />

Motors ________<br />

Junction Boxes ______<br />

Other ____________<br />

14. Access Doors Requirements __________________ Location ______________________<br />

15. Support Steel Required Not Required<br />

16. Pressure Switches Quantity ______________________ Alarm Shutdown<br />

Location ______________________ Setting _______ _______ in. W.G.<br />

______________________ _______ ______ in. W.G.<br />

______________________ _______ _______ in. W.G.<br />

17. Enclosure Finish Manufacturer’s Std _____________ Other _______________________<br />

18. General a) Collapsing Pressure Of Filter house (>21" Std) ______________ In. W.G.<br />

b) No Field Welding<br />

c) No Corteen<br />

d) All Electrical Components Will Be Wired To Junction Box(s) Which Will<br />

Be Provided At Location ______________________________________<br />

e) Bolts And Gaskets To Be Furnished In Vendor Plant.<br />

f) Fit-Up Of Components For Air Filter In Vendor Plant.<br />

19. Anti-Ice Piccolo Tubes: Required _________ Not Required ___________<br />

Materiel: Stainless Steel __________ Other __________<br />

Appendix C 357

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!