12.09.2014 Views

o_191ln0gpf9pgfdj4601afj5gva.pdf

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

22. Packaging For Shipment Per Spec __________________<br />

23. Spare Parts List Required ______ Yes _______ No<br />

24. Commercial Considerations<br />

A. Delivery Commitment ________ C. Warrantees Std _____ Other _____<br />

B. Progress Reports __ Yes __ No D. Sourcing ______________________<br />

Monthly _____ Other _____<br />

25 Drawings<br />

A. Proposal Outline ________________________<br />

B. Schedule For Approval Drawings (from date of order) _______________________<br />

C. Schedule For Final Certified Drawings (from date of order) ___________________<br />

26 Quality and Inspection<br />

A. Witness and Inspection Notice __________________________________________<br />

B. Shipping Release _____________________________________________________<br />

C. Material Certification _________________________________________________<br />

D. Radiographic Requirements ____________________________________________<br />

27. Installation and Maintenance Manuals<br />

A. Number Required ____________________<br />

B. Delivery Required ____________________<br />

362 Gas Turbine Handbook: Principles and Practices

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!