04.11.2014 Views

Distributed Renewable Energy Operating Impacts and Valuation Study

Distributed Renewable Energy Operating Impacts and Valuation Study

Distributed Renewable Energy Operating Impacts and Valuation Study

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Model Results<br />

Figure L-49. Cactus Annual <strong>Energy</strong> Savings<br />

Cactus<br />

Annual <strong>Energy</strong> Savings (%)<br />

45%<br />

40%<br />

35%<br />

30%<br />

25%<br />

20%<br />

15%<br />

10%<br />

Annual <strong>Energy</strong><br />

(MWh):<br />

C*17 = 42,474<br />

C*18 = 21,735<br />

Peak Dem<strong>and</strong> (MW):<br />

C*17 = 10<br />

Tracking <strong>Energy</strong><br />

Savings<br />

5%<br />

S Fixed <strong>Energy</strong><br />

Savings<br />

0%<br />

Base*1 Base*1.5 Base*2 Base*2.5 Base*3 Base*3.5 Base*4<br />

PV Capacity Options<br />

Base = 15% of Peak Dem<strong>and</strong><br />

Figure L-50. Cactus Annual Peak Dem<strong>and</strong> Savings<br />

Annual Peak Dem<strong>and</strong> Savings (%)<br />

6%<br />

5%<br />

4%<br />

3%<br />

2%<br />

1%<br />

Cactus<br />

Annual <strong>Energy</strong><br />

(MWh):<br />

C*17 = 42,474<br />

C*18 = 21,735<br />

Peak Dem<strong>and</strong> (MW):<br />

C*17 = 10<br />

C*18 7<br />

Tracking Peak<br />

Dem<strong>and</strong> Savings<br />

0%<br />

Base*1 Base*1.5 Base*2 Base*2.5 Base*3 Base*3.5 Base*4<br />

S Fixed Peak<br />

Dem<strong>and</strong> Savings<br />

-1%<br />

PV Capacity Options<br />

Base = 15% of Peak Dem<strong>and</strong><br />

Modeling <strong>and</strong> Analysis R. W. Beck, Inc. | L-25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!