Appendix L<br />

Figure L-71. Acoma Substation Annual <strong>Energy</strong> Savings<br />

Acoma Substation<br />

35%<br />

30%<br />

Annual <strong>Energy</strong> (MWh):<br />

AA1 = 279,077<br />

AA2 = 279,077<br />

Annual <strong>Energy</strong> Savings (%)<br />

25%<br />

20%<br />

15%<br />

10%<br />

5%<br />

Tracking <strong>Energy</strong><br />

Savings<br />

2hr Shft Tracking<br />

<strong>Energy</strong> Savings<br />

S Fixed <strong>Energy</strong><br />

Savings<br />

0%<br />

Base*1 Base*1.5 Base*2 Base*2.5 Base*3 Base*3.5 Base*4<br />

PV Capacity Options<br />

Base = 15% of Peak Dem<strong>and</strong><br />

SHW Fixed <strong>Energy</strong><br />

Savings<br />

Figure L-72. Acoma Substation Annual Peak Dem<strong>and</strong> Savings<br />

25%<br />

Acoma Substation<br />

Annual Peak Dem<strong>and</strong> Savings (%)<br />

20%<br />

15%<br />

10%<br />

5%<br />

Peak Dem<strong>and</strong> (MW):<br />

AA1 = 64<br />

AA2 = 64<br />

Tracking Peak<br />

Dem<strong>and</strong> Savings<br />

2hr Shft Tracking<br />

Peak Dem<strong>and</strong><br />

Savings<br />

S Fixed Peak<br />

Dem<strong>and</strong> Savings<br />

SHW Fixed Peak<br />

Dem<strong>and</strong> Savings<br />

0%<br />

Base*1 Base*1.5 Base*2 Base*2.5 Base*3 Base*3.5 Base*4<br />

PV Capacity Options<br />

Base = 15% of Peak Dem<strong>and</strong><br />

L-36 | R. W. Beck, Inc Arizona Public Service