Programmes Division <strong>Report</strong>s I Planning & Commissioning<br />
• advising on advances in medical treatment procedures<br />
• statutory requirements and recommendations<br />
• Continuation of Legionella Preventative Measures phased<br />
works programme. Phase 1 completed <strong>Hospital</strong> 4 and<br />
<strong>Hospital</strong> 5<br />
• in accordance with public procurement protocols<br />
and procedures<br />
Developments in <strong>2010</strong><br />
• Construction continued on National Programme<br />
for Radiation Oncology (Phase 1) Building – with<br />
commissioning stage beginning in December <strong>2010</strong>.<br />
Funded by the Health Services Executive and National<br />
Cancer Control Programme<br />
• Critical Care Upgrade project completion with refurbishment<br />
of Intensive Care Unit general 9 bed unit and single isolation<br />
room. Funded through the hospital fundraising entity<br />
<strong>St</strong>. James <strong>Hospital</strong> Foundation<br />
• General ICU/CCU relatives waiting area. Funded through<br />
the hospital fundraising entity <strong>St</strong>. James <strong>Hospital</strong><br />
Foundation and from funds raised from Medical students<br />
and staff of the critical care speciality<br />
• Replacement and addition of new Magnetic Resonance<br />
Imaging equipment and associated clinical support areas,<br />
including renovation of diagnostic imaging patient waiting<br />
and staff rest areas. Funded through the hospital minor<br />
capital programme<br />
• Replacement of the Intervention Radiology equipment and<br />
supporting clinical space. Funded through the hospital<br />
minor capital programme<br />
• Outpatients’ facilities expanded with creation of four new<br />
Examination & Consultation rooms and sub waiting and<br />
patient toilet area<br />
• Expansion of Oncology patient treatment area to<br />
accommodate three additional bays including single room.<br />
Funded through hospital initiatives<br />
• Upgrade continued of Clinical Information System for<br />
monitoring critical patients<br />
• Endoscopy decontamination systems replacement<br />
programme continued<br />
• Programme to upgrade, refurbish and expand Central<br />
Pathology Laboratory facilities completed<br />
• Programme to upgrade Operating Theatre infrastructural<br />
works (Electrical; Mechanical & refurbishment) completed<br />
• Phased replacement of Operating Theatre Lights completed<br />
• Laboratory <strong>St</strong>erilisers (Media & Discard) replaced in Central<br />
Pathology Laboratory<br />
• Medical Gasses upgrade programme continued<br />
• Ward en-suite facility upgrade programme continued<br />
• Provision of UPS systems for interventional radiography<br />
rooms completed<br />
• Ward Pantry upgrades continued<br />
• Fire monitoring system upgrade, replacement and<br />
expansion hospital wide continued<br />
Future Developments Include<br />
• Haemophilia & Hepatology In-Patient Facility and Clinical<br />
Research Facility – Planning permission granted. Tender<br />
design completed. Tender issued to contractors from<br />
qualifi ed panel<br />
• Progress Centre of Excellence for Successful Ageing –<br />
to seek government approval<br />
• Site preparatory works for National Programme for<br />
Radiation Oncology – Phase 2, to include:<br />
– Facilities Management building for admin and service<br />
support areas<br />
– Convert upper fl oors <strong>Hospital</strong> 1 for clinical support<br />
area use<br />
– <strong>St</strong>orage facility for medical slides and charts<br />
– Electrical substation relocation and upgrade<br />
– MV upgrade works for the Ring Main to facilitate NPRO<br />
– Expansion and replacement of MRI facilities<br />
– Replacement/Upgrade of Interventional radiography<br />
service provision<br />
– Expansion of out patient suite facilities (additional 4<br />
Treatment & Consultation rooms)<br />
– Men Against Cancer development design development<br />
– Progression of TB Regional Facility and Laboratory facility<br />
with HSE<br />
– Expansion of Endoscopy Facilities<br />
– Renovation of ICU facilities<br />
– Upgrade of the visitor waiting room (funds donated by<br />
<strong>St</strong>udent fundraising)<br />
124