- Page 1 and 2: BID DOCUMENT GOVERNMENT OF MADHYA P
- Page 3 and 4: Table of Contents SECTION Page Numb
- Page 5 and 6: GHz GoI/GOI GoMP/GOMP GUI IP IPS IS
- Page 7 and 8: SECTION I : Notice Inviting Bids (N
- Page 9: SECTION II : Introduction Conceptua
- Page 13 and 14: Militarized Zone Appln. Servers DB
- Page 15 and 16: 4. Testing and Acceptance The Vendo
- Page 17 and 18: to MPED. At the end of acceptance t
- Page 19 and 20: solution is functioning as intended
- Page 21 and 22: 4. SECTION IV: Hardware Specificati
- Page 23 and 24: 4.3) Web Server ((Rack mountable) F
- Page 25 and 26: 4.5 a) DNS/ DHCP Server (Rack mount
- Page 27 and 28: 4.5 c) Antivirus Server ((Rack moun
- Page 29 and 30: 4.5e) Domain Controller Server ((Ra
- Page 31 and 32: 4.5 g) Staging Server (Rack mountab
- Page 33 and 34: 4.6) System Software Components No.
- Page 35 and 36: drivers/functionality such as MPIO
- Page 37 and 38: 4.11) Gateway ANTI-VIRUS AND ANTI-S
- Page 39 and 40: Shall install on an NT/2000 server
- Page 41 and 42: 4.12) Desktop PC Processor Chipset
- Page 43 and 44: 4.13b) Laser Printer Black and whit
- Page 45 and 46: Bypass DG Compatibility Isolation S
- Page 47 and 48: 4.16 b) UPS 2 KVA offline 2KVA Ofli
- Page 49 and 50: 4.16 d) UPS 3 KVA Online Requiremen
- Page 51 and 52: 4.17) DG Set 60 KVA Supply of 60 KV
- Page 53 and 54: can diagnose root cause out of the
- Page 55 and 56: Live Health enables Script files ex
- Page 57 and 58: o Buffer Cache hit ratio to monitor
- Page 59 and 60: Network Management Fire walling fea
- Page 61 and 62:
Enterprise class Central User datab
- Page 63 and 64:
o Should provide Minimum & Maximum
- Page 65 and 66:
o o o o o o o o Should perform URL
- Page 67 and 68:
• Accurately identifies attacks w
- Page 69 and 70:
Security Content: • Consists of v
- Page 71 and 72:
Reporting: • Includes built-in re
- Page 73 and 74:
→ Should support 10G Should have
- Page 75 and 76:
· Unicast MAC filtering · Unicast
- Page 77 and 78:
o o o o o Management o o o o o o o
- Page 79 and 80:
ii. OSPF iii. OSPF Over Demand Circ
- Page 81 and 82:
i. The architecture should be based
- Page 83 and 84:
5 Ac Main Channel 12 Pts 5Amp flat
- Page 85 and 86:
(iii) b. To provide WAN management
- Page 87 and 88:
SECTION V: Roles and Responsibiliti
- Page 89 and 90:
e) Ability to track changes in conf
- Page 91 and 92:
SECTION VII: Instructions to Bidder
- Page 93 and 94:
“Contract Value” means the pric
- Page 95 and 96:
7.6.2 The Bidder is required to ens
- Page 97 and 98:
of work by the bidder 7. ISO 9001:2
- Page 99 and 100:
ix. Project Management, reporting a
- Page 101 and 102:
and outer envelopes shall be addres
- Page 103 and 104:
deviation, provided such a waiver d
- Page 105 and 106:
S.NO. Pre- Qualification Criteria R
- Page 107 and 108:
Criteria for Evaluation and Compari
- Page 109 and 110:
Attribute (s) Category Criteria Bre
- Page 111 and 112:
communicated to all the technically
- Page 113 and 114:
7.23.3 Expenses for the Contract Th
- Page 115 and 116:
For network, target Network availab
- Page 117 and 118:
Components A B Hardware, software
- Page 119 and 120:
(vi) d. The Vendor should have a we
- Page 121 and 122:
7.27.7.3 MPED to other offices Netw
- Page 123 and 124:
PBH ESH PID3 95 PID2 PID3 94.5 PID2
- Page 125 and 126:
(iii) (iv) (v) complete repairs to
- Page 127 and 128:
y the competent authority or in the
- Page 129 and 130:
. The Vendor is responsible for com
- Page 131 and 132:
carrying out of the work and to hav
- Page 133 and 134:
vi. Bid is not accompanied by all r
- Page 135 and 136:
LIST OF ATTACHED ANNEXURES Annexure
- Page 137 and 138:
21. District Excise Office Bhagwan
- Page 139 and 140:
68. Distillery Gwalior Distillers L
- Page 141 and 142:
115.District Excise Office Collecto
- Page 143 and 144:
163.District Excise Office District
- Page 145 and 146:
213.CL Storage Warehouse Near Bus S
- Page 147 and 148:
Annexure 3: To BID FORM Bid No EC-1
- Page 149 and 150:
Sl.No Financial Year Total Annual T
- Page 151 and 152:
C. Particulars of System Integratio
- Page 153 and 154:
Annexure 5: TECHNICAL BID COVERING
- Page 155 and 156:
Annexure 6: PERFORMANCE STATEMENT F
- Page 157 and 158:
Annexure 8: TECHNICAL DEVIATION FOR
- Page 159 and 160:
Annexure 10: [Date] COMMERCIAL BID
- Page 161 and 162:
Annexure 11: COMMERCIAL DEVIATION F
- Page 163 and 164:
18 d Mailing Solution No.s 19 Link
- Page 165 and 166:
Annexure 14: S.No Item Wise Price S
- Page 167 and 168:
31 32 I/O with GANG Box and face pl
- Page 169:
Annexure 16 Bid No EC-1 /2008 Forma