SECTION VI- Project Time Schedule<br />

For execution of entire work the total time span is approx. 16 weeks. However the Bidder<br />

can submit a detailed activities work plan as per Annexure 9. The list of major activities<br />

to be covered in the time schedule is given below:<br />

Activity No<br />

Scope of Work Area<br />

1. Creating Centralized Data Centre<br />

2. Solution Design<br />

3. Solution Implementation<br />

4. Testing and Acceptance<br />

5. Integration of the required Infrastructure<br />

6. Comprehensive Training<br />

7. Solution Documentation<br />