4. Testing and Acceptance The Vendor must build up an overall<br />

plan for testing and acceptance of<br />

system, in which specific methods<br />

and steps should be clearly indicated<br />

and approved by <strong>MPED</strong>. The<br />

acceptance test plan will be defined by<br />

the Bidder, agreed and approved by<br />

<strong>MPED</strong> and include all the necessary<br />

steps to ensure complete functionality,<br />

operation and performance of the<br />

system.<br />

1. All levels of testing will be conducted<br />

at the installation sites.<br />

2. Testing must demonstrate that the<br />

new systems satisfy the operational and<br />

technical performance criteria.<br />

3. It is Vendor’s responsibility during the<br />

tests to evaluate and recommend any<br />

further changes to the infrastructure.<br />

Any recommendations for change will be<br />

discussed with <strong>MPED</strong>.<br />

4.Testing Methodology/Techniques<br />

The Vendor must outline the<br />

methodology that will be used for<br />

testing.<br />

5. The Vendor must define the various<br />

levels or types of testing that will be<br />

performed.<br />

6. The Vendor must provide necessary<br />

checklist/documentation that will be<br />

required for testing.<br />

7. The Vendor must describe how the<br />

testing methodologies will conform to<br />

requirements.<br />

8. The Vendor must indicate how one<br />

will demonstrate to <strong>MPED</strong> that all<br />

functions in the new system installed<br />

have been tested.<br />

Operational Acceptance Tests<br />

1. <strong>MPED</strong> (with the assistance of the<br />

Supplier) may perform the following<br />

tests on the System and its Subsystems<br />

following Installation to determine<br />

whether the System and the<br />

Subsystems meet all the requirements<br />

mandated for Operational Acceptance.<br />