Testing Methodology/Techniques<br />
Successful completion of the contract<br />
will be gauged through a series of<br />
formal acceptance tests performed on<br />
all aspects of the system<br />
1. Security<br />
2. Testing Components and Component<br />
Integration<br />
3. Testing System Interfaces<br />
4. Testing for 24x7 availability<br />
5. Measuring response time, throughput<br />
and availability etc.<br />
User Information Testing<br />
1. The user documents, if applicable, will<br />
be reviewed for clarity, ease of use,<br />
details of all required system facilities,<br />
and details of all system error messages<br />
together with sufficient information to<br />
allow the replications of errors etc.<br />
The acceptance tests shall demonstrate<br />
that the Bidder has met each and every<br />
requirement specified within the contract<br />
and has delivered an effective operational<br />
system.<br />
Acceptance Milestones<br />
The acceptance test process will involve:<br />
1. Vendor (Agency) and <strong>MPED</strong> signoff<br />
the acceptance test result (to be provided<br />
by the Agency) sheet for each site.<br />
2. Agency and <strong>MPED</strong> signoff the final<br />
acceptance after the installation of<br />
system.<br />
Location of Acceptance Tests<br />
All acceptance tests will be performed at<br />
office/s of <strong>MPED</strong> as indicated in the<br />
Schedule of Requirements.<br />
Acceptance Test Responsibilities<br />
Project Management Committee will be<br />
responsible for tests and also will be<br />
responsible for recommendations of the<br />
final rating of all acceptance test results<br />