26.11.2014 Views

MPED-X-Routing-Tender20080721 - Madhya Pradesh State Excise

MPED-X-Routing-Tender20080721 - Madhya Pradesh State Excise

MPED-X-Routing-Tender20080721 - Madhya Pradesh State Excise

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.16.a.2) UPS 1 KVA online<br />

1 KVA ONLINE UPS<br />

Requirement<br />

Description<br />

Certifications ISO 9001 & 14001 certified to Manufacturer<br />

Technology Rectifier/Inverter device IGBT based<br />

Full Digital Signal Processing Design<br />

Double Conversion True On-line UPS<br />

Overall efficiency >88% (AC-AC)<br />

Inverter efficiency >90%<br />

Input<br />

Input Voltage & Range 120-280V AC, Single Phase on full load<br />

Input Frequency Range 50 Hz ± 10%<br />

Input Phase<br />

Single Phase with ground<br />

Input current Harmonic THD < 8%<br />

Input Power Factor 0.99 at full load<br />

OUTPUT<br />

Output<br />

1 KVA<br />

Voltage<br />

220VAC<br />

Voltage Regulation +/-2%<br />

Output Frequency regulation Free running Mode 50Hz ± 1%<br />

Sync Mode 50Hz ± 2%<br />

O/p Voltage Distortion < 5% (Non-linear load)<br />

< 2% (linear load)<br />

Output Waveform Pure Sine wave<br />

Crest Factor 3:01<br />

Power Factor<br />

0.7 lagging<br />

Battery<br />

Battery Backup<br />

120 minute<br />

Battery Type<br />

SMF VRLA type only with Racks & Interconnecting Links<br />

Recharing of Battery 4-6 hours depending on depth of discharge of battery<br />

Battery Make<br />

Rocket/Amararaja/Emerson/Exide/Quanta<br />

VDC<br />

To be specified<br />

Battery Ratings<br />

2KVA: 5040VAH<br />

Transfer Time<br />

0 ms<br />

General<br />

Display<br />

LED Display<br />

Overload capacity 105-125%-5 minutes<br />

Operating Temperature 0 to 40 degree centigrade<br />

Noise level<br />

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!