26.11.2014 Views

MPED-X-Routing-Tender20080721 - Madhya Pradesh State Excise

MPED-X-Routing-Tender20080721 - Madhya Pradesh State Excise

MPED-X-Routing-Tender20080721 - Madhya Pradesh State Excise

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(iii)<br />

(iv)<br />

(v)<br />

complete repairs to its network to enable the Competent Authority to use<br />

the Services. All such requests and service calls shall necessarily be<br />

logged in Helpdesk system (either verbal or through internet or in writing)<br />

and trouble tickets are generated for the same.<br />

In case of major breakdown in network and services, which requires<br />

immediate attention; Vendor will inform the Competent Authority<br />

immediately, about the problem, the Plan of Action and the expected<br />

time for service resumption. The Vendor shall inform the Competent<br />

Authority every 30 minutes till the problem is resolved and service is<br />

restored. However, the Vendor is required to provide the Root-Cause<br />

Analysis Report within 24 hours of service resumption.<br />

Vendor will provide the Competent Authority with the Monthly report in<br />

respect of downtime.<br />

The Vendor should have to replace/repair the Hardware / Software or<br />

active / passive components those are faulty (partially or complete)<br />

within maximum three days time.<br />

7.27.15 Migration to IP version 6 (IPv6)<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

During the entire project cycle, Vendor can be asked to migrate to IP<br />

version 6, from IP version 4 (which is de facto standard on present date).<br />

This activity will be carried out on the request of <strong>MPED</strong> during any time<br />

of the project cycle.<br />

Vendor has to prepare project plan for this migration activity, and provide<br />

complete support to <strong>MPED</strong>/DoIT for the smooth transition from IPv4 to<br />

IPv6, whenever desired.<br />

All expenses or cost for this migration will be borne by Vendor.<br />

This migration will be done for all Hardware/Software provided by Vendor<br />

supplied during the project. All the required activities, for this IP<br />

migration, shall include addition, deletion, up gradation, change in<br />

hardware/ software of supplied items.<br />

7.28 INTELLECTUAL PROPERTY RIGHTS<br />

7.28.1 The Vendor will ensure that there is no violation of intellectual property rights, in<br />

any form, during execution of this project.<br />

7.28.2 The Vendor shall indemnify the Competent Authority from all actions, costs,<br />

claims, demands, expenses & liabilities, whatsoever, resulting from any actual or alleged<br />

infringement as aforesaid and at the expenses of the Vendor the <strong>State</strong><br />

Government/Competent Authority shall be defended in the defense of any proceedings<br />

that may be brought in that connection.<br />

125

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!