110<br />

3. FUSION TECHNOLOGY<br />

3.12 Safety and Environment, Power<br />

Plant Studies and Socio-Economics<br />

container of 1000-g capacity would not be considered unreasonable to limit the<br />

number of shipments and hence the risk of possible hijacking by terrorists.<br />

Tritium (and other fusion materials) is excluded from the Non-Proliferation Treaty;<br />

nevertheless, tritium can be shipped across national borders only if there exists a<br />

nuclear co-operation agreement between the countries involved.<br />

Accident sequences analysis<br />

Accident analyses have to verify that the future reactors concepts do no represent a<br />

safety concern. A list of the data necessary for the accident analyses in the PPCS was<br />

prepared [3.83]. The main scope of the work was to have a common database for the<br />

analysts working on accident analyses, to avoid incongruent final results due to the<br />

different assumptions and parameters used.<br />

[3.83] M.T. Porfiri,<br />

Required data for the<br />

accident analyses in<br />

power plant conceptual<br />

study assessment, <strong>ENEA</strong><br />

FUS-TN-SA-SE-R-027<br />

(2001)<br />

3.12.6 European ITER site at Cadarache<br />

In 2001, EFDA charged the European ITER Site Study Group (EISSG) with the tasks<br />

of verifying whether the ITER Site Requirements and Assumptions could be met at<br />

Cadarache and studying and estimating any necessary adaptation works. <strong>ENEA</strong>’s<br />

Fusion Division acted as overall co-ordinator of the work and also provided<br />

substantial support in the following fields:<br />

Safety and Licensing. The scope of the task was to verify whether the ALARA<br />

approach had been implemented in the ORE assessments for ITER and that it was<br />

compatible with French regulations.<br />

Socio-Economy. The Socio-Economic Research on Fusion (SERF) already performed<br />

for the ITER Generic Site was reviewed for adaptation to Cadarache. The problem of<br />

public awareness and acceptance of fusion was investigated.<br />

Electrical Power Supply. The effect of the ITER electrical load on the Cadarache local<br />

network was studied. The ITER power supply design modifications were identified<br />

and evaluated, and improvements to the ITER design were suggested. <strong>ENEA</strong> was<br />

also responsible for co-ordinating the work of other laboratories (CEA, RFX) and of<br />

European industries (e.g., European Fusion Engineering & Technology).