Metrobus Transit Study.pdf - City of St. John's
Metrobus Transit Study.pdf - City of St. John's
Metrobus Transit Study.pdf - City of St. John's
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>St</strong>. John’s Transportation Commission (<strong>Metrobus</strong>) 2011<br />
Market Assessment and <strong>St</strong>rategic Directions <strong><strong>St</strong>udy</strong> – Reference List<br />
Table 19 - <strong>Transit</strong> Operations Recommendations<br />
Recommendation Timing Next <strong>St</strong>eps<br />
Route Designation (Section 10.1)<br />
Designate Route 15 as a<br />
Primary Route.<br />
Designate Route 10 as a Base<br />
Route, including improvements<br />
to level <strong>of</strong> service.<br />
Route <strong>St</strong>ructure (Section 10.2)<br />
Review corridor service<br />
opportunities between each <strong>of</strong><br />
the major nodes within the<br />
system, including the potential<br />
provision <strong>of</strong> more direct twoway<br />
service.<br />
Explore the opportunity to<br />
increase the importance <strong>of</strong> the<br />
Memorial University/<br />
Confederation Building node as<br />
a transfer point.<br />
Explore opportunities to<br />
interline routes at each <strong>of</strong> the<br />
terminals.<br />
Hours <strong>of</strong> Service (Section 10.3)<br />
Explore opportunities to extend<br />
service hours in areas covered<br />
by Secondary Routes using<br />
applications for low demand<br />
periods or areas such as<br />
TransCab, Zone bus or<br />
industrial specials.<br />
IT<br />
ST<br />
ST<br />
IT<br />
ST<br />
IT<br />
IT<br />
Update service standards to include Route 15 as a<br />
Primary Route.<br />
No increase in operating or capital cost.<br />
Seek Commission approval to increase revenue service<br />
hours.<br />
Update service standards to reflect new designation.<br />
Subject to budget availability and capital (buses<br />
required).<br />
Complete as part <strong>of</strong> a five-year operational review<br />
update (2 to 5 year timeframe).<br />
Conduct passenger boarding/alighting survey at each<br />
terminal.<br />
Complete as part <strong>of</strong> a five-year operational review<br />
update (2 to 5 year timeframe) or with potential U-<br />
Pass opportunity at Memorial University.<br />
Conduct a transfer trace and assessment <strong>of</strong> schedule<br />
compatibility for possible route pairs.<br />
Identify routes that should be interlined at each<br />
terminal.<br />
Initiate discussions with Mount Pearl to interline<br />
routes and avoid the forced transfer at the Village Mall<br />
terminal.<br />
Conduct passenger boarding and alighting counts to<br />
determine areas <strong>of</strong> low demand.<br />
Implement new approaches, subject to budget<br />
approval.<br />
Dillon Consulting Limited Page 110